My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/3/1989
CBCC
>
Meetings
>
1980's
>
1989
>
1/3/1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2023 10:21:06 AM
Creation date
6/12/2015 2:39:14 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
01/03/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECONCILIATION <br />CHANGE ORDER <br />NO. 1 <br />DATED Nov. 1, 1988 <br />OWNER'S PROJECT NO. 8617 ENGINEER'S PROJECT NO. 8617 <br />PROJECT Wabasso Causeway Dredging <br />OWNER <br />Indian River County <br />CONTRACTOR B.R. Marine Const. Inc.CONTRACT DATE July 8, 1988 <br />CONTRACT FOR Dredging services for Wabasso Relief Bridge. <br />NATURE OF THE CHANGE: <br />This is a reconciliation change order to make a final <br />adjustment in the total number of cubic yards dredged. <br />The original estimate was 5100 cubic yards. The final <br />measurement. as determined by the Engineering Division was <br />5600 cubic yards, a difference of 500 cubic yards. <br />The contract price per cubic yard is $3.00 so that the <br />total additional cost is -500 x 3.00 = $1500.00 <br />The changes result in the following adjustment of Contract price and Time: <br />Original Contract Price <br />Contract Adjustment by previous Change Orders $ -0- <br />Net (Increase) (Decrease) resulting from this Change Order <br />, •I <br />Current Price Including This Change Order. $ 36,000.00 <br />$ 34,500.00 <br />$ 1,500.00 <br />Page 1 of 2 pages <br />Contract Time Prior to this Change Order 40 Calendar Days <br />Net (Increase) (Decrease) resulting from <br />this Change Order 0 Calendar Days <br />Current Contract time including this <br />Change Order 40 Calendar Days <br />The above changes are approved: <br />41 <br />neer <br />By: <br />Date: //t, AP(P' <br />The above changes are accepted: <br />In@fn RYA C <br />Admin <br />Legal <br />Budget <br />Deo L QIN <br />Plsk Mgr <br />JAN 3 1989 <br />67 <br />ontract <br />By <br />Title: <br />Date: <br />//city <br />ACCEPTED BY: <br />INDIAN RIVER COUNTY, FLORIDA <br />e, Chairman <br />J -3-r7 <br />Date <br />-ZVc <br />BOOK 15 Eta 511 <br />
The URL can be used to link to this page
Your browser does not support the video tag.