My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/3/1989
CBCC
>
Meetings
>
1980's
>
1989
>
1/3/1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2023 10:21:06 AM
Creation date
6/12/2015 2:39:14 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
01/03/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JAW <br />aoov t`.i'�r 512 <br />WAIVER OF FLOODPLAIN CUT AND FILL BALANCE FOR HOSPITAL SERVICE <br />CENTER SUBDIVISION <br />The Board reviewed the following memo dated 12/15/88: <br />TO: William G. Collins II <br />Acting County Administrator <br />THROUGH: James W. Davis, P.E., C.! <br />Public Works Director:�py, <br />FROM: David B. Cox,'C, <br />I, <br />Traffic Engineering Manager <br />SUBJECT: Request for Waiver of Floodplain Cut and Fill <br />Balance for Hospital. Services Subdivision <br />REF. LETTER: Steve Moler, P.E. to Dave Cox dated Dec. 2, 1988 <br />DATE: December 15, 1988 <br />DESCRIPTION AND CONDITIONS <br />Masteller & Moler Associates on behalf of the developer of <br />Hospital Services Subdivision is requesting a waiver of the cut <br />and fill balance requirement of the Stormwater Management and <br />Flood Protection Ordinance 87-12. Hospital Services Center <br />Subdivision received preliminary plat approval on December 15, <br />1988. It is located on the north side of Barber Avenue directly <br />across from Indian River Memorial Hospital. The project engineer <br />has determined that the volume of the 10 year floodplain capacity <br />of the Indian River will be reduced by 0.007% due to the fill <br />needed to build the subdivision. <br />ALTERNATIVES AND ANALYSIS <br />Since the Indian River in this location is an estuarine <br />environment, and the project engineer has stated that all other <br />design requirements of Ordinance 87-12 will be met and that the <br />resulting rise of the water level in the river will be <br />negligible, staff has no objection. <br />RECOMMENDATION <br />Staff recommends that a waiver to the flood displacement <br />requirement be granted to Hospital Services Center Subdivision. <br />ON MOTION by Commissioner Scurlock, SECONDED by <br />Commissioner Eggert, the Board unanimously granted <br />a waiver of floodplain cut and fill balance for <br />Hospital Service Center Subdivision, as recommended by <br />staff. <br />68 <br />
The URL can be used to link to this page
Your browser does not support the video tag.