My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2/14/1989
CBCC
>
Meetings
>
1980's
>
1989
>
2/14/1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2023 10:38:41 AM
Creation date
6/12/2015 2:40:17 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
02/14/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DISCUSSION OF COURTHOUSE/MAIN LIBRARY PROJECTS <br />The Board reviewed the following memo dated 2/8/89: <br />TO: Board of County Commissioners DATE: February 8, 1989 FILE: <br />SUBJECT: <br />FRO • ames E. Chandler REFERENCES: <br />County Administrator <br />At the February 14, 1989 meeting, a general status report will be presented <br />concerning the proposed projects in the downtown area. The items outlined <br />in the attachments and below will be elaborated on at the meeting. <br />In recent weeks, to provide a continuing overall coordinated approach a <br />number of meetings and discussions have been held. Included have been <br />staff, city personnel, library consultants and various other individuals <br />involved in the programs. <br />As a result, any number of factors have been identified that will need to be <br />addressed at the appropriate time as the total program progresses. These <br />include such items as total land requirements, cost, historic significance of <br />certain buildings, internal traffic flow, parking, etc. <br />The attached memo from Stan Boling summarizes the current general status <br />and proposed approach in continuing the total program. The architects will <br />present an overview of the main library project at the meeting. <br />For planning purposes the street rights-of-way in the six block area have <br />been included. In a meeting with the City Planner it was suggested that a <br />thoroughfare plan (attached) could be adopted by the City and County. <br />Those minor street rights-of-way not included could be vacated if needed. <br />In essence, it is recommended that the library project continue as originally <br />planned. Parking requirements alone for the courthouse project dictate the <br />need for a master plan for the area east of the library. Such a plan would <br />also address and provide alternatives for many of the other factors that need <br />to be considered. The maximum estimated cost for development of the master <br />plan is $30,000 to $40,000 and can perhaps be accomplished for less. <br />If after discussion at the February 14th meeting the Commission concurs with <br />the preceding, staff will proceed with implementation. <br />67 <br />FEB 14` ') <br />EcioF 76 f! JL 138 <br />
The URL can be used to link to this page
Your browser does not support the video tag.