Laserfiche WebLink
AAY 2 3 1999 Bou 6 F,aUF 936 7 <br />perform the engineering services at a reasonable cost. The <br />estimated costs of construction of the improvements $550,000. <br />.Engineering costs funded by the County.are $30,050 plus right- <br />of-way survey which may be performed by County crews or by the <br />Consultant once preliminary work is accomplished. Costs to the <br />developer total $33,950(impact fee credits). The County Commis- <br />sion approved entering into a Master Agreement with Kimley-Horn <br />and Associates in 1987 after formal advertising and selection <br />under the CCNA. <br />ALTERNATIVES AND ANALYSIS <br />The Alternatives are as follows: <br />Alternative No. 1 <br />Approve a joint County/Developer project to design five lane <br />widening improvements along Oslo Road from approximately <br />500' west of Old Dixie Highway to US 1. The County's work <br />tasks shall be authorized under a Work Order under a Master <br />Agreement between Indian River County and Kimley-Horn and <br />Assoc. at a cost of $30,050. The developer would perform <br />certain work tasks and receive impact fee credits of <br />$33,950. Once engineering and right-of-way acquisition is <br />complete, District 6 impact fees and gas tax revenue would <br />fund construction. <br />Alternative No. 2 <br />Implement only signalization of Oslo Road/Old Dixie Highway <br />at this time without road widening. If this is performed, <br />the County would have to remove these improvements in 1996 <br />when five laning is scheduled. <br />RECOMMENDATION AND FUNDING <br />It is recommended that Alternative No. 1 be approved. Funding at <br />this time in the amount of $30,050 would be from District 6 Road <br />Impact Fees (balance on 4-30-89 is $541,414.34 and $96,000 is <br />presently uncommitted to projects). A formal Work Order and <br />Master Agreement will be forthcoming. <br />Director Davis informed the Board that the Helseths have <br />concerns. They live on both corners of Oslo and Old Dixie and <br />own just about all of the property -along the length of the <br />project west of the railroad track. Their concerns are due to <br />the fact that there is a garage structure on the north side of <br />Oslo in close proximity to the project, and their elderly mother <br />lives in the house to the north of the roadway. They would <br />appreciate it if we would not 5 lane the section west of Old <br />Dixie at this time. Director Davis noted there is some <br />flexibility to maybe drop out a lane or two to the west of Old <br />Dixie, and he felt that could work for probably a 4-5 year <br />period. We still could implement the ultimate section east of <br />Old Dixie, and he believed we can design with the Helseth's <br />interests in mind. <br />54 <br />