My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/5/1989
CBCC
>
Meetings
>
1980's
>
1989
>
9/5/1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:01:03 PM
Creation date
6/15/2015 4:53:52 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
09/05/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
porn <br />S E P 5 1989 BOOK F'°,GE 833 <br />WAIVER OF FLOODPLAIN CUT & FILL BALANCE - SAVANNAH OAKS SUBDV. <br />The Board reviewed memo from the Engineering Department: <br />----------------------------------------------------------------- <br />TO: James Chandler <br />County Administrator <br />THROUGH: James W. Davis, P.E. <br />Public Works Director <br />and <br />James D. White, P.E.C2�� <br />County Engineer <br />FROM: David B. Cox, P. E Arm. <br />Acting Traffic Engineer <br />SUBJECT: Request for Waiver of Floodplain Cut and Fill <br />Balance for Savannah Oaks Subdivision <br />REFERENCE LETTER: Randy L. Mosby, P.E. to James W. Davis, P.E. <br />Dated June 12, 1989 <br />DATE: August 28, 1989 <br />----------------------------------------------------------------- <br />DESCRIPTION AND CONDITIONS <br />Mosby & Associates on behalf of the developers of Savannah Oaks <br />Subdivision is requesting a waiver of the cut and fill balance <br />requirement of Section 7B(1) of Stormwater and Flood Protection <br />Ordinance 87-12. Savannah Oaks Subdivision received Preliminary <br />Plat Approval on August 11, 1989. The 4.76 acre property is <br />located on a northerly extension of the existing Bucki ghammock <br />Trail adjacent to the northwest corner of the Vero Beach Country <br />Club Golf Course. <br />ALTERNATIVES AND ANALYSIS <br />The site is located in the Indian River Floodplain and drains <br />into Valkenberg Creek. The project engineer has stated the <br />proposed amount of fill required to develop the subdivision (421 <br />cubic yards) will not alter the 100 year floodplain. All other <br />requirements of the Stormwater Management and Flood Protection <br />Ordinance have been met. <br />RECOMMENDATION <br />Staff recommends that a waiver of the cut and fill balance be <br />granted to Savannah Oaks Subdivision. <br />ON MOTION by Commissioner Bowman, SECONDED by Commis- <br />sioner Eggert, the Board unanimously granted a waiver <br />of the cut and fill balance requirement to Savannah <br />Oaks Subdivision as recommended by staff. <br />34 <br />� � r <br />
The URL can be used to link to this page
Your browser does not support the video tag.