My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/5/1989
CBCC
>
Meetings
>
1980's
>
1989
>
9/5/1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:01:03 PM
Creation date
6/15/2015 4:53:52 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
09/05/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
is how you would get the westbound left turns onto the Boulevard <br />South extension. <br />Commissioner Bird did not see how you can have something <br />coming in at a 900 angle on a major thoroughfare without an <br />underpass or overpass to keep the traffic moving, but Director <br />Davis noted that no matter where you terminate the bridge, you <br />still will have dual left turn lanes. <br />Commissioner Bird asked who is recommending Alternate #3, <br />and Director Davis advised that the DOT commissioned their <br />consultant to do the feasibility study, and that document was <br />discussed at advertised public meetings held at the City Council <br />Chambers and at Vero Beach High School auditorium. There has <br />been a lot of comment on the alternatives. The City has <br />preferred the third alternative and they have done some work <br />looking at the impact on the commercial area along the present <br />bridge causeway. <br />Commissioner Scurlock inquired about our participation with <br />our Transportation Planning Committee and technical staff, and <br />Director Davis noted that this was taken to the TPC months ago, <br />and staff has kept the committee informed of public hearing <br />dates; it has been mainly staff advising the Committee of what <br />has been happening. The Committee has not been vocal or specific <br />on this issue. <br />Commissioner Bird asked what some of the negatives are for <br />Alternative #2, which he felt looks shorter and doesn't appear <br />that it would be so disruptive to traffic while they were <br />building it. Is there a concern about how high it has to be and <br />the curve in it? <br />Director Davis explained that the horizontal curve in the <br />alignment is necessary to reach the 65' vertical clearance at the <br />channel. The concern has been that the touch -down point on the <br />west side is so far west that they feel it will have a negative <br />effect on the businesses along the causeway. Many business <br />39 <br />,� �.. <br />EP 199 eoo� F ;��:� <br />
The URL can be used to link to this page
Your browser does not support the video tag.