My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/19/1989
CBCC
>
Meetings
>
1980's
>
1989
>
9/19/1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:01:03 PM
Creation date
6/5/2015 12:16:56 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
09/19/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOOK m�� �, <br />SEP 101 F4.F1O60 <br />them every minute they asked for to correct the problems, and <br />they couldn't do it and finally walked off the job. <br />Director Dean informed the Board that the man from ECSI did <br />replace the top panels, but it still doesn't work. The new <br />people will use the console and the existing wiring, but all the <br />button, relays, and the mechanisms on the doors themselves, will <br />be changed. He advised that Mr. Tim Carter of Blevins'Electric <br />is present if the Board has any questions. <br />Chairman Wheeler wished to know if Mr. Carter is or has been <br />in any way associated with ECSI, and Mr. Carter stated that they <br />are not associated with ECSI in any way whatsoever. <br />Commissioner Bird wished to know if Mr. Carter could give us <br />any comfort that our never ending headache with this problem will <br />go away soon. <br />Mr. Carter commented that all he can say is that the only <br />thing Blevins does is jail improvements and locking controls, and <br />their references are excellent. He explained that they will be <br />totally replacing all the controls, but they will be using <br />existing locks and the wire and the conduit coming to the relay <br />panel. The wire from the relay panel to the console unit itself <br />will be replaced, the face plates will be replaced, and all <br />electronics. <br />Administrator Chandler advised the Board that Blevins has <br />had experience on other projects in other locations where ECSI <br />has been there before them. <br />MOTION WAS MADE by Commissioner Scurlock, SECONDED <br />by Commissioner Bird, to approve the proposed contract <br />with Blevins Electric, Inc., as recommended by staff <br />and authorize the Chairman to execute the applicable <br />documents. <br />Commissioner Bowman expressed the hope that we are building <br />32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.