My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/19/1989
CBCC
>
Meetings
>
1980's
>
1989
>
9/19/1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:01:03 PM
Creation date
6/5/2015 12:16:56 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
09/19/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a good tight case, including the man hours and staff time that <br />have been lost on this problem. <br />Director Dean assured her that all our time, materials, <br />etc., have been carefully documented, and Frizzell is keeping a <br />record of their time also. <br />THE CHAIRMAN CALLED FOR THE QUESTION. <br />It was voted on and carried unanimously. <br />C O N T R A C T <br />between <br />INDIAN RIVER COUNTY, FLORIDA, <br />and <br />BLEVINS ELECTRIC, INC. <br />Re: PHASE II, INDIAN RIVER COUNTY JAIL <br />This AGREEMENT dated this 19th day of September—, <br />1989, by and between INDIAN RIVER COUNTY, FLORIDA, a <br />political subdivision of the State of Florida, 1840 25th <br />Street, Vero Beach, FL 32960 (COUNTY), and BLEVINS ELECTRIC, <br />INC., a corporation existing under the laws of the State of <br />Tennessee, Post Office Box 25, Kingsport, TN 37662 <br />(CONTRACTOR), <br />W-1 T N E S S ETH : <br />WHEREAS, COUNTY owns and operates a County Jail <br />composed of certain modules; and <br />WHEREAS, one module known as Phase II of the Jail <br />was . comp leted by Schopke Construction Co., who used as an <br />electric engineer, E.C.S.I.; and <br />;q� <br />WHEREAS,_ the work performed by E.C.S.I. has never <br />t <br />been accepted by the COUNTY, and E.C.S.I. has been unable to <br />rectify the problems under the warranty provisions of the <br />contract; and <br />WHEREAS, COUNTY has requested proposals from other <br />electrical engineers to correct the deficiencies existing in <br />the Phase II Control System; and <br />WHEREAS, CONTRACTOR has submitted a proposal which <br />is acceptable to the COUNTY, <br />OEC 1J t' 089 33 BOC1K 17 FA1,4061 <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.