Laserfiche WebLink
DEC <br />BOOK. <br />F- JE. 6've <br />Commissioner Scurlock asked if Marshall, McCully & Associates <br />had ever built a bridge for us, and Public Works Director Jim <br />Davis advised that they are doing this in a joint venture with a <br />large firm that specializes in bridges. <br />Commissioner Scurlock wondered why Lloyd & Associates wasn't <br />ranked higher after they did such a good job on the bridge over by <br />the country club. <br />Director Davis explained that they were ranked #3 out of 23 <br />firms, but the thinking was that we need to go with the eshto-beam <br />girders more so than the hollow -core, pre -stress slabs. The DOT <br />has developed problems with the hollow -core, pre -stress slabs, <br />which has been the typical type of bridge that Lloyd & Associates <br />has desicrned for us. Lloyd & Associates has indicated they can <br />do the eshto-beam design, but he believed the committee felt that <br />some of these other firms had a better handle on that type of <br />construction. <br />Commissioner Scurlock felt that makes a big difference, <br />because generally he was not too ecstatic about joint ventures <br />since they usually end up with two overheads, a flow-through and a <br />percentage on top of the other firm's work. <br />Director Davis emphasized that if we find that in the <br />negotiations on the contract, we will go to the #2 ranked firm, <br />Mosby & Associates, who has designed about 7 bridges in this <br />general area, but not in this county. <br />Administrator Chandler reported that after the Board gave <br />approval last Tuesday to go ahead on the repair/replacement of the <br />bridges that were identified by the DOT to have severe corrosion, <br />staff has determined that two of the Oslo Road bridges, the ones <br />east of 58th and 43rd Avenues, definitely will be replaced, while <br />a third one east of 74th Avenue is a likely candidate as well. <br />They feel the one on Winter Beach Road can be repaired. <br />Consideration was given to having the bridge replacements done on <br />an emergency basis by the same construction firm that is replacing <br />46 <br />