FINAL CHANGE ORDER - ENGINEERING SERVICES - ROCKRIDGE SEWER <br />PROJECT <br />The Board reviewed the following memo dated 12/19/89: <br />DATE: DECEMBER 19, 1989 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />FROM: TERRANCE G. PINTO <br />DIRECTOR OF.UTILITY SERVICES <br />SUBJECT: FINAL CHANGE ORDER - ENGINEERING SERVICES <br />ROCKRIDGE SEWER PROJECT <br />IRC PROJECT NO. US -87 -08 -CCS <br />PREPARED AND STAFFED BY: HARRY E. ASHER <br />ASSISTANT DIRECTOR OF UTILITY SERVICES <br />BACKGROUND <br />The final Change Order for the construction contract of the <br />Rockridge Sewer Project was approved by the Board of County <br />Commissioners on October 10, 1989. The total construction cost was <br />$1,990,157.67, a reduction of $421,622.00 from the original contract <br />price. The project resulted in the abandonment of 413 existing <br />septic tanks, the installation of 413_grinde_r__pumps with basins, 413 <br />service connections, approximately 38,750 feet of force main, nine <br />wet taps to existing force mains, and associated restoration. The <br />expanded EPA and DER requirements necessitated the extension of the <br />project construction time. <br />ANALYSIS <br />The existing construction time required additional general services <br />and resident inspection by the engineer. The balance due the <br />engineer is $45,296.00, which will bring the ,total cost for <br />engineering services to $167,896.00; $5,683.00 under the EPA Grant <br />amount for engineering of $173,579.00. The Department of Utility <br />Services is pleased to inform the Board of County Commissioners that <br />the total engineering costs of $167,896.00 represents a total of <br />8.390 of total construction cost.of $1,990,157.00 for engineering <br />services. <br />Indian River County will receive from EPA/DER $5,683.00 above our <br />total engineering cost. <br />RECOMMENDATION <br />The staff of the Department of Utility Services recommends approval <br />for payment of the final amount of $45,296.00 for engineering <br />services to the engineer to finalize the Rockridge Project. <br />53 <br />� JAN 21990 <br />boa _ tI C) [a6L sdu <br />