My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/2/1990
CBCC
>
Meetings
>
1990's
>
1990
>
1/2/1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:02:43 PM
Creation date
6/16/2015 8:34:18 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
01/02/1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'JAN 2 1990 <br />78 r= r <br />8001 `a ,r. <br />Commissioner Scurlock asked if the 8.39% includes the <br />resident inspection fees, and Utilities Director Pinto confirmed <br />that it does. <br />ON MOTION by Commissioner Scurlock, SECONDED by <br />Commissioner Bowman, the Board unanimously approved <br />payment of the final amount of $45,296 for engineering <br />services to Camp Dresser McKee to finalize the <br />Rockridge project. <br />BAYTREE FORCE MAIN <br />The Board reviewed the following memo dated 12/19/89: <br />DATE: DECEMBER 19, 1989 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />FROM: TERRANCE G. PINTO <br />-------- ---------DIRECTOR OF UTILITY SERVICES <br />SUBJECT: BAYTREE FORCE MAIN <br />IRC PROJECT NO. US -89 -15 -CS <br />PREPARED AND STAFFED BY: JOHN FREDERICK <br />ENVIRONMENTAL SLANPECT IST <br />DEPARTMENT OF UTILI I SERVICES <br />BACKGROUND <br />The Sea Oaks Wastewater Treatment Plant is the regional facility for <br />the North Beach Region of the County for sewage treatment. The <br />Baytree Wastewater Treatment Plant is a franchise facility lying <br />directly to the south. Since the County is in possession of the Sea <br />Oaks facility, the franchise is being phased out. The plant <br />abandonment and removal will be the responsibility of the <br />franchisee. The connection of the existing force main to the County <br />force main system will be the responsibility of the County. <br />ANALYSIS <br />The engineering, permitting and drafting will be by County <br />personnel. The project, to save time and cost, is proposed as a <br />change order to the South Sixth Avenue Sewer Improvement Project. <br />Utilizing this project will result in a savings of bidding costs and <br />provide M.intity discounts not available for such a small job. In <br />addition, this force main construction will complete the force main <br />system of the North Beach region south of State Road 510. The <br />contractor has.calculated the cost to the County based upon the unit <br />costs in the contract as $8,124.48, as shown in the proposal. <br />54 <br />
The URL can be used to link to this page
Your browser does not support the video tag.