Laserfiche WebLink
c. Construct a sidewalk along the overall site's entire College Lane frontage and repair <br />the site's SR 60 sidewalk if so required by Public Works. <br />d. Install the west bound right turn lane on College Lane at the project's entrance, <br />install the east bound right -turn lane on SR 60 at the project's entrance, and obtain <br />Public Work's approval of turn lane construction. <br />e. Install or escrow for construction of the proposed transit stop/shelter along the <br />project's SR 60 frontage. <br />f. Install the off-site sidewalk segments along College Lane between the project site <br />and 5811' Avenue. 3 -Ea PA Ca E ,IA <br />3. The Reserve at Vero Beach project site shall revert to its original RM -8 zoning if project <br />construction has not commenced within 7 years of the approval of the conceptual PD plan <br />and PDMXD rezoning.. <br />4. Any fast food re, talurant with a drive through is restricted to the easternmost and middle <br />commercial pfcels (commercial Lots 2 and 3). <br />5. Const ion on commercial Lot 2 shall not commence until construction has started on <br />25% 40 units) of the project's total number of residential units. <br />ATTACHMENTS: <br />1. Application <br />2. Location Map <br />3. Approved Minutes from September 11, 2014 Planning & Zoning Commission Meeting <br />4. Traffic Summary <br />5. Rezoning Ordinance <br />6. Building Elevations (Commercial and Residential) <br />7. Conceptual Plans (Site Plan, Aerial, Landscape Plan) <br />APPROVED AGENDA ITEM: <br />FOR: October 14, 2014 <br />BY: : ,cam _t) ly • .l fid <br />Indian River Co, <br />A oved <br />Date <br />Admin. <br />ire <br />10/g//� <br />Legal <br />L" <br />iC1- ,21 - (`I <br />_ <br />Budget <br />10014 <br />Dept. <br />. <br />1° 7// y <br />Risk Mgr. <br />- <br />F:\Community Development\CurDev\BCC\2014 BCC\Thereserveatverobeach(PD-14-06-04).doc 16 <br />181 <br />