Laserfiche WebLink
added a post-C.O. monitoring condition that directs Traffic Engineering to evaluate <br />circulation and parking conditions and authorizes signage improvements, if warranted, <br />that will be funded by the church. Church representatives have indicated that such <br />condition is acceptable to the church. <br />8. Off -Street Parking: Required: 0 spaces <br />Proposed: 9 spaces <br />Note: As allowed by code, the spaces will be stabilized, grassed, and maintained <br />consistent with the existing grassed parking at the church. <br />9. Stormwater Management: A single dry stormwater management area will be <br />constructed north of the proposed stabilized grassed parking spaces. The proposed <br />stormwater management plan has been reviewed and approved by Public Works. <br />10. Landscaping Plan: The proposed landscape plan is in compliance with the requirements <br />of Chapter 926. This includes installation of a 25' wide Type "B" buffer on the north and <br />west sides of the subject lot as well as roadside buffers along 129th Court and the adjacent <br />alley. <br />11. Utilities: No new structures are proposed on the subject site. Therefore, water and sewer <br />services are not required or proposed. <br />12. Site Lighting: The Planning & Zoning Commission recommended that site lighting be <br />prohibited on the proposed parking lot. During site plan review, staff confirmed that no <br />site outdoor lighting was proposed. At the Planning & Zoning Commission meeting, the <br />applicant's agent confirmed that no outdoor lighting is proposed with this project and that <br />the church does not object to a condition prohibiting outdoor lighting on the proposed <br />parking lot. Staff has added a recommended condition that outdoor lighting be prohibited <br />on the subject parking lot site. <br />13. Roseland Corridor: In 2003, the Board of County Commissioners approved the <br />Roseland Corridor Plan. The purpose and intent of the plan is to preserve and enhance <br />the appearance of Roseland, recognize and enhance the area's historic character, and <br />encourage compatible uses. Roseland is one of the historic communities in the County <br />and the church has been part of the area's historic Roseland Community for almost 100 <br />years. <br />As an institutional use, the church is subject to the Roseland Corridor criteria. The <br />criteria are designed to implement the corridor's purpose and intent. Based on the scope <br />of the subject project/request, the Roseland Corridor standards for minor site plans apply. <br />In this case, since the project involves only an accessory parking lot, corridor landscaping <br />requirements apply and have been satisfied. <br />F:1Community Development \CurDcv\BCC12014 BCC\RUMCParking(SP-SE•14-06-13).doc 3 <br />71 <br />