My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/8/1990
CBCC
>
Meetings
>
1990's
>
1990
>
5/8/1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:02:44 PM
Creation date
6/16/2015 9:02:21 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
05/08/1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AY 8 1990 Q <br />BOOK ®0 FAGE 73 <br />ON MOTION by Commissioner Scurlock, SECONDED by Com- <br />missioner Wheeler, the Board unanimously approved <br />Change Order #1 as recommended by staff and authorized <br />the Chairman to execute the appropriate documents. <br />Chairman Wheeler expressed his pleasure that the Construc- <br />tion Manager is working out as we had hoped. <br />Emergency Management Director Wright advised the Board that <br />this will move the completion date to March 11, 1991, instead of <br />March 1st. <br />CHANGE OWNER IR 2140 <br />ARCHITECT <br />ORDER CONTRACTOR IRIR <br />AIA DOCUMENT 6701 FIELD ER <br />OTHER.R FM, Lastovica <br />PROJECT: Indian River County Jail, Phase III CHANGE ORDER NUMBER: 1 <br />(name, address) DATE: April 20, 1.990 <br />TO CONTRACTOR: ARCHITECT'S PROJECT NO: 2140 <br />(name, address) <br />CONTRACT DATE: October 17, 1989 <br />Robert F. Wilson, Inc. CONTRACT FOR: Phase III Addition <br />P.O. Bos 760 <br />Vero Beach, FL 32961 <br />The Contract Is changed as follows: <br />Extend the Contract completion dates (substantial and final) by 10 calendar <br />days each at no additional cost to the Owner. <br />Not valid until signed by the Owner, Architect and Contractor. <br />The original (Contract Sum) (rjX0 3X0ft)0}a0g0gK6qX01was ................... . .. . . f 5,103, 000.00 <br />Net change by previously authorized Change Orders ............................... t — 0 — <br />The (Contract Sum) (OltXi 10Y4rMX1XYjX0[tX@ K0jprlor to this Change order was .......... f 5,103, 000.00 <br />The (Contract Sum) 9MXd D[d(@(3dl0)0l0)rANXwill be <br />(unchanged) by this Chapge Order In the amount of .............................. S — 0 — <br />The new (Contract Sum)M0)tXX((X0[K#)4)OIMTW0 including this Change Order will be ..$ 5,103,000.00 <br />The Contract Time will be (increased) Ten ( 10 ) days. <br />The date of Substantial Completion as of the date of this Change Order therefore Is 435 days of ter receipt of. notice <br />to proceed. <br />NOTE. This summary does not reflect changes In the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by <br />Construction Change Directive. <br />W.R. FRIZZELL ARCHITECTS. INC. ROBERT F. WILSON. INC. Indian River -County <br />ARCHITECT CONTRACTOR OWNER <br />5600 PGA Blvd., Suite 200 P.O. Bos 760 1840 25th Street <br />Address Address Addrea <br />1m 1; h _ 17FL 33416 Vero Bp -ac _3 61_ Vero Beach, FL 32960 <br />By — --��% A_ By <br />DATE �� � - DATE � Z J � i � DATE <br />AIA DOCUMEMr 0701 rd'i.N(;E ORDFat 1987 EDITION • A1A* • 01987 • TIIE ANDLtGAI. •- UFf�ly�jlNc1�87 - <br />AMERICAN IN511rUTR OP AROUTP.CTS, 17.15 NFW YORK AVE., KW.. WA.SIUNGTON, D.C. 24=6 <br />Charles P. Vilunac <br />70 <br />
The URL can be used to link to this page
Your browser does not support the video tag.