My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/25/1990
CBCC
>
Meetings
>
1990's
>
1990
>
9/25/1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:02:46 PM
Creation date
6/16/2015 9:47:56 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
09/25/1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L.� <br />displaced which serve to preserve health and safety or correct <br />existing deficiencies, the proposed improvements meet all the <br />criteria for top priority. <br />The following tables specifically identify necessary capital <br />improvements required by the project. <br />ROADWAY IMPROVEMENT <br />COSTS <br />Roadway/Segment Improvement Length Total <br />Cost Year <br />($000) Req <br />S.R. 60 <br />58th <br />to <br />66th Ave. <br />2 <br />Ln <br />1.0 <br />mi. <br />2000 <br />1991 <br />58th <br />12th <br />St. <br />to 16th St. <br />2 <br />Ln <br />0.5 <br />mi. <br />700 <br />1991 <br />58th <br />16th <br />to <br />12th St. <br />2 <br />Ln <br />0.5 <br />mi. <br />700 <br />1993 <br />58th <br />SR 60 <br />to <br />33rd St. <br />2 <br />Ln <br />0.5 <br />mi. <br />700 <br />1995 <br />43rd <br />12th <br />St. <br />to 26th St. <br />2 <br />Ln <br />1.5 <br />mi. <br />1500 <br />1995 <br />26th <br />58th <br />to <br />66th Ave. <br />2 <br />Ln <br />1.0 <br />mi. <br />700 <br />1991 <br />Total <br />6300 <br />INTERSECTION IMPROVEMENTS <br />Intersection <br />Improvement C.P. Timing <br />Project <br />Cost $ <br />SR 60/58th Ave <br />NB dual left --- <br />EB through/right <br />WB through/right <br />U.S. 1/17th St. <br />WB dual left --- <br />50,000 <br />EB right <br />25,000 <br />S.R. 60/66th Ave <br />Signalization --- <br />SR 60/58th Ave <br />EB right --- <br />SR 60/20th Ave <br />SB right --- <br />SR 60/43rd Ave <br />NB dual left <br />58th/16th St. <br />Signalization <br />100,000 <br />175,000 <br />*Intersection improvements included in roadway improvement costs. <br />The capital costs for required roadway and intersection. <br />improvements total an estimated $6.475 million by the year 1995. <br />To reflect this added cost,.the Capital Improvements budget must <br />be amended to_identify the funding sources for the $x:475 million <br />in -traffic related improvements. Since the county has adopted. a - <br />traffic impact. fee; most..roadway and transportation related <br />improvements are funded from that source. Other traffic related <br />improvements are funded through gasoline tax revenues. In this <br />case, however, the improvements will- be entirely funded by <br />developer contribution, with only a partial impact fee credit. <br />The table below identifies that Capital Improvements funding. <br />Source Amount (Mill) <br />Development TIF $2.0 <br />Developer Contribution 4.475 <br />Total $6.475 <br />SEP 25 1990 27 � oK � . F'aa <br />
The URL can be used to link to this page
Your browser does not support the video tag.