My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/2/1990
CBCC
>
Meetings
>
1990's
>
1990
>
10/2/1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:02:46 PM
Creation date
6/16/2015 9:49:23 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
10/02/1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U <br />2. Zoning Classification: <br />3. Land Use Designation: <br />BOOR 81 PAI(JE 549 <br />RS -3, Residential Single -Family up <br />to 3 unfits per acre <br />L-1, Low -Density Residential up to <br />3 units per acre <br />4. Greenhouse and Pergola Building Area: <br />Greenhouse: 1,191 sq. ft. S ,4- <br />Enclosed Storage/Tool Shed:. -801--��• <br />Pergola:• <br />Total 2,208 sq. ft. <br />5. New Impervious Area: 20,250 sq. ft. or 56% of the <br />development area <br />6. Open Space Required: 14,462. sq. ft. or 40% of the <br />development area <br />Provided:- 15,900 sq. ft. or 44% of the <br />development area <br />7. Traffic.Circulation: The site will access Little Harbor Lane <br />via the principal residential -use driveway. <br />B. Off -Street Parking Required: 2 spaces (for the principal <br />residential use) <br />Provided: 3+ spaces <br />9. Stormwater Management: The Stormwater Management Plan has <br />been approved by the Public Works Department, and a Type "B" <br />Stormwater Permit has been issued. However, the finished <br />floor elevations proposed for the greenhouse are below the <br />base flood elevation established for the site. Indian River <br />County regulations require that the finished floor elevations <br />for non-residential structures in flood zones be at or above <br />the respective base flood elevation, or the structure must be <br />watertight below the base flood elevation. The plan must be <br />revised to indicate that the finished floor elevation of the <br />greenhouse is at or above the site's base flood elevation, or <br />construction of the greenhouse must be watertight below the <br />site's base flood elevation. <br />10. Landscape Plan: The landscape plan is in conformance with <br />Ordinance #84-47. <br />11. Utilities: The project will be served by public water and <br />wastewater service 'from the City of Vero Beach Utilities. As <br />an accessory structure its service will be connected with that <br />of the principal residential use. <br />12. Special Exception Criteria, Section 25.1(a)(7)c: <br />a. Such uses shall be deemed accessory to the principal use <br />on site. <br />b. All storage areas be screened by a fence or fully <br />enclosed within a structure. <br />C. Such uses shall comply with all provisions of Section <br />25(g), accessory buildings. <br />d. Such uses shall satisfy all of the maximum lot coverage <br />and minimum space provisions of the applicable zoning <br />district. <br />e. No retail or wholesaling sale and/or leasing activities <br />shall be permitted. <br />The project has satisfied all of the above listed criteria <br />which can be satisfied prior to construction of the <br />2 <br />33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.