My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/6/1990
CBCC
>
Meetings
>
1990's
>
1990
>
11/6/1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:02:47 PM
Creation date
6/16/2015 9:52:05 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
11/06/1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ON MOTION by Commissioner Scurlock, SECONDED by <br />Commissioner Bird, the Board unanimously approved final <br />pay request and Change Order No. 3 for Derrico <br />Construction Company, as recommended by staff. <br />FINAL PAYMENT FORM AND CHANGE ORDER #3 ARE ON FILE IN THE OFFICE <br />OF THE CLERK TO THE BOARD <br />ENGINEERING FIRM CONTRACT - BLUE CYPRESS LAKE COMMUNITY <br />WASTEWATER IMPROVEMENTS <br />The Board reviewed the following memo dated 10/24/90: <br />DATE: OCTOBER 24, 1990 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />FROM: TERRANCE G. PINT <br />DIRECTOR OF UTILI Y RVICES <br />PREPARED JOHN F. LANG 9�-L- <br />AND STAFFED ENVIRONMENTAIV SPECIALIST <br />BY: DEPARTMENT OF UTILITY SERVICES <br />SUBJECT: ENGINEERING FIRM CONTRACT <br />BLUE CYPRESS LAKE COMMUNITY WASTEWATER IMPROVEMENTS <br />INDIAN RIVER COUNTY PROJECT NO. IIS-90-01-DC/CS/ED <br />BACKGROUND <br />The Department of Utility Services, in response to HRS and its <br />concerns over septic tank leachate contaminating Blue Cypress Lake, <br />has initiated a Wastewater Improvement Project with Board of County <br />Commissioners' approval. The design study was conducted by Post, <br />Buckley, Schuh & Jernigan, Inc., and was received March 14, 1989, by <br />the Department. Negotiations with PBS&J indicated that the CCNA : <br />threshold amounts had been reached, and RLI's were generated. <br />Responses were received and evaluated. Negotiations with the No. 1 <br />ranked firm, PBS&J, were unsatisfactory, and the No. 2 ranked firm, <br />PEC, Inc., was contacted. The firm accepted the scope of services <br />and a fee based upon FmHA guidelines. <br />ANALYSIS <br />The project will consist of design, permitting, and construction of <br />collection, transmission, treatment, and effluent disposal systems. <br />The cost estimate for construction is $400,000.00 for these systems. <br />The County -owned River Run WWTP is to be relocated and placed upon <br />County to -be -purchased property. The engineering design and survey <br />estimated cost is $36,700.00; the full-time inspection services <br />estimated cost is $16,800.00, and the geotechnical and aerial <br />investigations estimated cost is $12,100.00. The total engineering <br />services upset limit for the project is $65,600.00. <br />W <br />
The URL can be used to link to this page
Your browser does not support the video tag.