Laserfiche WebLink
r � r <br />ANALYSIS: <br />By participating in the Commercial/ Industrial Load Control Program, <br />the Department could potentially realize annual savings of <br />approximately $30,000.00, projected by using actual consumption data <br />and operating conditions for the period November 1989 through <br />October 1990. The Program grants reduced rates for the privilege of <br />interrupting electrical loads as previously agreed to under the <br />agreement. The plant would normally generate its own power in these <br />emergency situations. The Department of Utility Services requests <br />approval to enter. into the Commercial/Industrial Load Program <br />Agreement with Florida Power and Light, to become effective with the <br />completion of the new generating system at the South County R.O. <br />Water Plant. <br />RECOMMENDATION• <br />The Department of Utility Services recommends that the Board of <br />County Commissioners approve the Department's request to enter into <br />the Commercial/ Industrial Load Program Agreement with Florida Power <br />and Light and authorize execution of the Agreement. <br />ON MOTION by Commissioner Scurlock, SECONDED by <br />Commissioner Eggert, the Board unanimously approved <br />the Utility Department's request to enter into the <br />Commercial/Industrial Load Program Agreement with <br />FPSL and authorized execution of the Agreement. <br />AGREEMENT WILL BE PLACED ON FILE IN THE OFFICE OF THE CLERK TO <br />THE BOARD WHEN PROPERLY EXECUTED AND RECEIVED <br />ENGINEERING FIRM SELECTION - CENTRAL REGION EFFLUENT DISPOSAL <br />SYSTEM <br />The Board reviewed the following memo dated 2/7/91: <br />DATE: FEBRUARY 7, 1991 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />FROM: TERRANCE G. PINOITSPEWVICES DIRECTOR OF UTI <br />STAFFED AND HARRY.E. ASHE <br />PREPARED BY: ASSISTANT DIRE TOR OF UTILITY SERVICES <br />SUBJECT: ENGINEERING FIRM SELECTION <br />ENGINEERING DESIGN AND CONSTRUCTION INSPECTION <br />SERVICES FOR A CENTRAL REGION EFFLUENT DISPOSAL <br />SYSTEM <br />27 0., <br />FEB 19 mijE <br />