My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-111 (2)
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-111 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2018 1:53:33 PM
Creation date
3/23/2016 8:35:47 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
01/13/2010
Control Number
2010-111
Agenda Item Number
12.J.1.
Entity Name
Timothy Rose
Subject
North Water Treatment Plant Raw Water Transmission System
Area
Pre Bid Meeting
Project Number
UCP 2422
Bid Number
201024
Supplemental fields
FilePath
H:\Indian River\Network Files\SL000005\S0001WQ.tif
Meeting Body
Board of County Commissioners
Meeting Type
BCC Regular Meeting
SmeadsoftID
8458
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
577
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. CONTRACTOR shall assume full responsibility for security of all his and his <br />subCONTRACTOR's materials and equipment stored on the site. <br />D. If directed by the OWNER or ENGINEER, move any stored items which interfere with <br />operations of OWNER or other contractor's. <br />E. Obtain and pay for use of additional storage or work areas if needed to perform the Work. <br />F. The CONTRACTOR shall be responsible for obtaining temporary sanitary facilities <br />during construction and all associated costs. <br />1.06 SITE ACCESS AND EXISTING FACILITIES <br />A. Access to the site and equipment delivery is limited to daylight hours of 7:00 a.m. to 5:00 <br />p.m., Monday through Friday. Weekend access must be approved by OWNER. All work <br />which interrupts normal system operation shall be scheduled with the OWNER prior to <br />its construction. Scheduling shall include summary of procedures to be taken, date/time <br />of work, and duration of activities. Due to operation issues, the OWNER reserves the <br />right to modify the schedule and restrict time of day and/or date(s) of work (for both <br />work herein listed and other work not listed but affecting operations) that impacts the <br />system operations. <br />B. The CONTRACTOR shall provide and maintain the current level or a greater level of <br />perimeter site security and restricted public access at all times throughout construction of <br />the project. At no time shall any portion of the site perimeter be provided without a <br />secure and continuous fence at the end of each day. The cost to furnish and install all <br />required permanent and temporary fencing shall be at the sole expense of the <br />CONTRACTOR. <br />1.07 CONTRACTOR's STAGING, STORAGE, AND STOCKPILE AREA <br />A. The CONTRACTOR shall minimize the quantity of materials stored at the plant site <br />throughout the construction period. The CONTRACTOR is responsible for properly <br />storing and protecting the area such that adjacent residents, canals, and wetlands are not <br />impacted. The CONTRACTOR shall be solely responsible for implementing theft <br />prevention measures. The OWNER shall bear no responsibility for materials stolen or <br />acts of vandalism. The CONTRACTOR shall supply temporary enclosed, locked storage <br />for OWNER's spare parts until Substantial Completion. <br />1.08 CONNECTION TO WORK BY OTHERS OR EXISTING LINES <br />A. Piping installed under this Contract must connect to lines installed under other contracts. <br />The CONTRACTOR under this Contract shall perform the following work and include <br />the cost thereof in the Contract price: <br />1. Remove any temporary plugs and thrust restraints provided in the pipe installed <br />under other contracts. <br />2. Furnish and install necessary pipe, sleeves, fittings, specials and appurtenances to <br />make proper connections to pipes installed by others. <br />3. Pressure test connections prior to connecting new piping. <br />01010-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.