C. CONTRACTOR shall assume full responsibility for security of all his and his <br />subCONTRACTOR's materials and equipment stored on the site. <br />D. If directed by the OWNER or ENGINEER, move any stored items which interfere with <br />operations of OWNER or other contractor's. <br />E. Obtain and pay for use of additional storage or work areas if needed to perform the Work. <br />F. The CONTRACTOR shall be responsible for obtaining temporary sanitary facilities <br />during construction and all associated costs. <br />1.06 SITE ACCESS AND EXISTING FACILITIES <br />A. Access to the site and equipment delivery is limited to daylight hours of 7:00 a.m. to 5:00 <br />p.m., Monday through Friday. Weekend access must be approved by OWNER. All work <br />which interrupts normal system operation shall be scheduled with the OWNER prior to <br />its construction. Scheduling shall include summary of procedures to be taken, date/time <br />of work, and duration of activities. Due to operation issues, the OWNER reserves the <br />right to modify the schedule and restrict time of day and/or date(s) of work (for both <br />work herein listed and other work not listed but affecting operations) that impacts the <br />system operations. <br />B. The CONTRACTOR shall provide and maintain the current level or a greater level of <br />perimeter site security and restricted public access at all times throughout construction of <br />the project. At no time shall any portion of the site perimeter be provided without a <br />secure and continuous fence at the end of each day. The cost to furnish and install all <br />required permanent and temporary fencing shall be at the sole expense of the <br />CONTRACTOR. <br />1.07 CONTRACTOR's STAGING, STORAGE, AND STOCKPILE AREA <br />A. The CONTRACTOR shall minimize the quantity of materials stored at the plant site <br />throughout the construction period. The CONTRACTOR is responsible for properly <br />storing and protecting the area such that adjacent residents, canals, and wetlands are not <br />impacted. The CONTRACTOR shall be solely responsible for implementing theft <br />prevention measures. The OWNER shall bear no responsibility for materials stolen or <br />acts of vandalism. The CONTRACTOR shall supply temporary enclosed, locked storage <br />for OWNER's spare parts until Substantial Completion. <br />1.08 CONNECTION TO WORK BY OTHERS OR EXISTING LINES <br />A. Piping installed under this Contract must connect to lines installed under other contracts. <br />The CONTRACTOR under this Contract shall perform the following work and include <br />the cost thereof in the Contract price: <br />1. Remove any temporary plugs and thrust restraints provided in the pipe installed <br />under other contracts. <br />2. Furnish and install necessary pipe, sleeves, fittings, specials and appurtenances to <br />make proper connections to pipes installed by others. <br />3. Pressure test connections prior to connecting new piping. <br />01010-2 <br />