My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/15/2011 (4)
CBCC
>
Meetings
>
2010's
>
2011
>
03/15/2011 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2018 2:11:31 PM
Creation date
3/23/2016 8:36:40 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/15/2011
Meeting Body
Board of County Commissioners
Supplemental fields
FilePath
H:\Indian River\Network Files\SL000008\S0002II.tif
SmeadsoftID
11228
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
N_rl <br />INDIAN RIVER COUNTY, FLORIDA <br />BOARD MEMORANDUM <br />TO: Joseph A. Baird, <br />County Administrator <br />THROUGH: Christopher R. Mora, P. E. <br />Public Works Director <br />FROM: Qom. James D. Gray, Jr. Cn\rr`' <br />V Coastal Engineer <br />SUBJECT: Sector 3 Beach Restoration Project <br />Change Order No. 4 - Fuel Cost- Increase <br />Ranger Construction Industries, Inc. <br />DATE: March 8, 2011 <br />DESCRIPTION AND CONDITIONS <br />On February 2, 2010, the Board of County Commissioners awarded a contract to Ranger <br />Construction Industries, Inc. (Ranger) to construct the Sector 3 Beach Restoration <br />Project. The project was to utilize sand from upland sand sources. The sand was to be <br />mined, processed and then hauled in trucks to the beach. Based on Ranger's bid dated <br />August 3, 2009, the Board awarded a contract to Ranger in the amount of $7,270,807. <br />On March 23, 2010, the Board approved Change Orders #1 and #2 which boosted the <br />total construction contract price from $7,270,807 to $10,319,234. Change Orders #1 <br />and #2 were requested by the contractor due to additional costs associated with <br />dredging, sand processing / testing and increased sand volumes required to fill the <br />beach template. At the 03-23-2010 meeting, Ranger stated that the remaining sand to <br />be provided for the project would be "locked -in" at the price of $15.66 per cubic yard, <br />with no further price increases for the life of the project. <br />On October 19, 2010, the Board approved Change Order #3 which allowed Ranger to <br />charge the County a partial payment for stockpiled sand at the mine. Change Order #3 <br />did not increase the overall contract price, which remained at $10,319,234. <br />In a recent letter (dated March 4, 2011), Ranger now contends that since the time of bid <br />(August, 2009), there have been unforeseeable and substantial increases in the cost of <br />fuel. They have requested the attached Change Order #4 in the amount of $303,480. <br />FAPublic Works\CRM\My Documents\Coastal\Beach Sector 3 Change Order #4 BCC 03-15-201 l.docx <br />116 <br />
The URL can be used to link to this page
Your browser does not support the video tag.