My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-018B
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-018B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2018 2:10:04 PM
Creation date
3/23/2016 8:37:03 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
01/22/2018
Control Number
2013-018B
Agenda Item Number
8.H.
Entity Name
West Regional Wastewater Treatment Plant
Subject
Anaerobic Tanks Odor Control System Design
Project Number
UCP - 4067
Bid Number
2013013
Alternate Name
WWTP
Supplemental fields
FilePath
H:\Indian River\Network Files\SL000008\S0002K7.tif
Meeting Body
Board of County Commissioners
Meeting Type
BCC Regular Meeting
SmeadsoftID
11749
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
506
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SC -4.02B. Delete paragraph 4.02 b in its entirety and replace with the following: <br />The information and data shown or indicated in the Contract Documents with respect to <br />Underground Facilities owned by others or contiguous to the site is based on information and data <br />furnished to Owner or the Engineer by the owners of such Underground Facilities or by others. The <br />Owner and Engineer shall not be responsible for the accuracy or completeness of any such <br />information or data, and the Contractor shall have full responsibility for reviewing and checking all <br />such information and data. <br />SC 4.03A Delete 4.03 A of the General Conditions in its entirety and replace it with the following: <br />A. Notice. The Contractor shall promptly, and before such conditions are disturbed, and in no event <br />later than 10 days after first observance of the conditions, notify the Owner and Engineer in writing <br />of: (1) subsurface or latent physical conditions at the site differing materially from those indicated in <br />this Contract, or (2) unknown physical conditions at the site of an unusual nature, differing materially <br />from those ordinarily encountered and generally recognized as inherent in Work of the character <br />provided for in this Contract. The Owner will promptly investigate the conditions, and if it finds that <br />such conditions do materially so differ and cause an increase or decrease in the Contractor's cost <br />of, or the time required for, performance of any part of the Work under this Contract, a Change <br />Order shall be issued accordingly based on the Schedule of Values and executed by the Owner and <br />the Contractor. Contractor's failure to provide notice upon discovery of the differing site condition <br />shall waive any entitlement to such an adjustment in the Contract Price or Contract Time. Further, <br />no Claim of the Contractor under this paragraph 4.03A shall be allowed unless the Contractor has <br />given the notice as required in this paragraph 4.03A. <br />SC 4.03C1 Delete subparagraph 4.03C1 of the General Conditions in its entirety. <br />SC 4.03-C.3: Delete the words: "arbitration or" in line 10 of paragraph 4.03-C.3 of the General <br />Conditions. <br />SC -4.05A. <br />Add the following new paragraph immediately after paragraph 4.05A. of the General Conditions to <br />read as follows: <br />B. Engineer may check the lines, elevations, reference marks, batter boards, etc., set by Contractor, <br />and Contractor shall correct any errors disclosed by such check. Such a check shall not be <br />considered as approval f th oentiretorWork. Contractor's lshall furnish personnel tnot relieve Contractor ofo assistEngineer in <br />accurate construction o <br />checking lines and grades. <br />SC 4.06D Delete the last sentence of paragraph 4.06D of the General Conditions in its entirety <br />SC 4.06G Delete paragraph 4.06G of the General Conditions in its entirety. <br />Add the following new Section immediately after paragraph 4.06I of the General Conditions to read <br />as follows: <br />SC 4.07 Archaeological or Resources at Site <br />SC4.07A If Archaeological or Historical Resources are revealed, uncovered or discovered at site, <br />Contractor shall cease work immediately and solicit the services of an Archaeologist Registered with <br />�( the Registry of Professional Archaeologists. Based on Archaeologist's determination, Contractor <br />00800-5 <br />