My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/14/1991
CBCC
>
Meetings
>
1990's
>
1991
>
5/14/1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:03:09 PM
Creation date
6/16/2015 10:20:07 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
05/14/1991
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAY 14 1991 <br />RESOLUTION NO. 91- 6 0 <br />A RESOLUTION OF INDIAN RIVER COUNTY, <br />FLORIDA, SETTING A TIME AND PLACE AT WHICH <br />THE OWNERS OF PROPERTY IN THE AREA <br />BORDERED ON THE NORTH BY 12TH STREET, ON <br />THE SOUTH BY 8TH STREET, ON THE WEST BY <br />43RD AVENUE, AND ON THE EAST BY 27TH <br />AVENUE, AND OTHER INTERESTED PERSONS, MAY <br />APPEAR BEFORE THE BOARD OF COUNTY <br />COMMISSIONERS AND BE HEARD AS TO THE <br />PROPRIETY AND ADVISABILITY OF <br />CONSTRUCTING A WATERLINE EXTENSION, AS TO <br />THE COST THEREOF, AS TO THE MANNER OF <br />PAYMENT THEREFOR, AND AS TO THE AMOUNT <br />THEREOF TO BE SPECIALLY ASSESSED AGAINST <br />EACH PROPERTY BENEFITED THEREBY. <br />RESOLUTIONS 91-59 AND 91-60 ARE ON FILE IN THE OFFICE OF THE <br />CLERK IN THEIR ENTIRETY. <br />GIFFORD WW TREATMENT PLANT EXPANSION, PHASE II <br />The Board reviewed memo from Director Pinto: <br />DATE: MAY 1, 1991 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATO <br />FROM: TERRANCE G. PINT /;? <br />DIRECTOR OF UTI RVICES <br />PREPARED WILLIAM F. McC�IER <br />N <br />AND STAFFED CAPITAL PROJEC <br />BY: DEPARTMENT OF U TY SERVICES <br />SUBJECT: GIFFORD WASTEWATER TREATMENT PLANT EXPANSION <br />PHASE II <br />BACKGROUND <br />'On August 11, 1988, the Board of County Commissioners approved Work <br />Authorization No. 21 with the firm of Masteller and Moler <br />' Associates, Inc., for the design of the above -listed project. We <br />are now preparing to bid this job out sometime in late May or June. <br />Since the original design was completed, several. changes in both <br />design and scope of engineering services have had to be made. <br />ANALYSIS <br />An addendum to the above -listed Work Authorization is attached. An <br />exact description of the additional work is under Task 1 of that <br />document. There is one cost element associated with this Work <br />Authorization --an additional $7,500.00 for basis engineering <br />54 <br />
The URL can be used to link to this page
Your browser does not support the video tag.