My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/14/1991
CBCC
>
Meetings
>
1990's
>
1991
>
5/14/1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:03:09 PM
Creation date
6/16/2015 10:20:07 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
05/14/1991
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
services. The total cost for engineering services is well within <br />the acceptable percentage range. Payment for this work will come <br />from the Wastewater Impact Fee Funds. <br />RECOMMENDATION <br />The staff of the Department of Utility Services recommends that the <br />Board of County Commissioners approve the attached Work <br />Authorization with Masteller and Moler Associates, Inc. <br />ON MOTION by Commissioner Scurlock, SECONDED by Com- <br />missioner Eggert, the Board unanimously approved <br />Work Authorization No. 91VVW-1 with Masteller & Moler <br />Associates (Addendum to Work Authorization No. 21) <br />as recommended by staff. <br />H <br />ENGINEERING WORK AUTHORIZATION <br />DATE: April 17, 1991 WORK AUTHORIZATION NO. 91WW-1 FOR CONSULTING <br />SERVICES. PROJECT NO. 9104 COUNTY, I.D. 8821S MASTELLER & MOLER <br />ASSOCIATES, INC. WASTEWATER. <br />I. PROJECT DESCRIPTION <br />Title: Addendum to Work Authorization 121, dated 8/11/88 for Proposed <br />1.0 MGD Expansion and Modifications to Existing Gifford <br />Subregional Wastewater Treatment Plant as follows: <br />TASK I: Engineer, design and prepare contract plan modifications to <br />plant influent after static screens to allow influent to go directly into <br />plant or surge tank; preparation of specifications to allow <br />poured -in-place concrete in lieu of Marolf Pre -cast construction; design <br />and application of permits for installation of an above ground diesel <br />fuel storage tank to handle both the new and existing electric generator; <br />and review of poured -in-place concrete specifications by a structural <br />engineer. <br />-II. LUMP SUM FEE FOR SERVICES <br />The Lump Sum Fee for the above described project is listed below for each <br />Task. All fees will be due and payable monthly. The amount due shall be <br />determined by the estimated percentage abiount of work completed to date. <br />This will be accomplished by taking that estimated percentage amount of <br />work completed to date and multiplying it by the project lump sum fee. <br />Lump"Sum Fee Task I <br />APPROVED BY:.., <br />INDIAN RIVER COUNTY <br />BOARD OF COUNTYICOMMISSIONERS <br />By <br />Richard N. Bird <br />Chairman <br />Date &- / �z - �?/ <br />$ 7,500.00 <br />SUBMITTED BY: <br />MASTELLER & MOLER ASSOCIATES, INC. <br />By-� S Earl H. H. Masteller, P.E. <br />President <br />Date <br />55 <br />MAY 14 1991moK <br />
The URL can be used to link to this page
Your browser does not support the video tag.