My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-000 (2)
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-000 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2018 12:54:31 PM
Creation date
3/23/2016 9:12:18 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
08/20/2013
Control Number
2013-000
Subject
Fertilizer and Landscape Management
Area
Old Dixie Highway Sidewalk 38th Lane to 45th Street
Alternate Name
Sidewalk Improvements
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000I\S0005EA.tif
Meeting Body
Board of County Commissioners
Meeting Type
BCC Regular Meeting
SmeadsoftID
14586
Document Relationships
2013-014
(Agenda)
Path:
\Ordinances\2010's\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.4 DISTRIBUTION OF THE CONSTRUCTION SCHEDULES <br /> A. After receiving approval by the ENGINEER, distribute copies of the <br /> approved initial schedule and all reviewed revisions (updated) to: <br /> 1. Job site file. <br /> 2. Subcontractors. <br /> 3. Other concerned parties. <br /> 4. OWNER (two copies). <br /> 5. ENGINEER <br /> B. In the cover letter, instruct recipients to report promptly to the <br /> CONTRACTOR, in writing, any problems anticipated by the projections <br /> shown in the schedules. <br /> + + END OF SECTION + + <br /> 01310-2 01310 Construction Schedule <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\0845B-Old Dixie Hwy Sidewalk(38th Ln-45th St)\Admim\bid <br /> documents\Master Contract Documents\01310-Construction Schedule.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.