My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/08/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
10/08/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 10:43:55 AM
Creation date
3/23/2016 9:03:09 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
10/08/2013
Meeting Body
Board of County Commissioners
Book and Page
302
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000G\S0004NO.tif
SmeadsoftID
14229
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
302
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Van Fleet Water Production Facility Improvements BVP 13-196 <br /> The completed WRR must be saved using the date and name of the Project given by the County <br /> (Format: YYMMDD_ProjectName_Project ID; For example, `Polk Project' for the week <br /> ending Friday, March 1, 2005, should be labeled '050301_PolkProject_01-123-45-6789'). This <br /> will facilitate the County in analyzing all Projects on a weekly basis. <br /> ONLINE GUIDE AND TUTORIAL <br /> A short video tutorial is also available online to the BV Contractor at <br /> http://www.pbsrg.com/pips/videotutorials/ which provides information on the WRR. The BV <br /> Contractor is required to watch this video during the Pre-Award Phase. <br /> The WRR consists of scope changes or unforeseen events that are risks to the Project in terms of <br /> cost, schedule, or County satisfaction including any issues that could potentially develop into a <br /> risk. When a new issue is identified, it is added to the Project risks, along with the following: <br /> Identification date (date the risk was identified), plan to minimize the risk, resolution due date, <br /> impact to critical path or schedule(in days), and impact to final cost(in dollars). <br /> Prior to submitting the report,the BV Contractor must contact the County if there are any risks or <br /> potential risks identified. The County is required to provide a satisfaction rating based on the <br /> identified risk and the BV Contractor's plan to mitigate the risk. The rating is based on a Best <br /> Value Scale of 1-5-10 (10 being completely satisfied, 5 being satisfied and 1 being completely <br /> dissatisfied). The Project Manager may modify their satisfaction ratings at any time throughout <br /> the Project. When a risk is resolved,the actual date of resolution must be listed. <br /> The BV Contractor is also required to submit a detailed Project schedule (including the NTP <br /> date, Substantial Completion date, and Final Completion date) in the WRR. The detailed Project <br /> schedule report must contain the BV Contractor's original schedule along with the current <br /> estimated schedule. <br /> Note: The WRR will be analyzed for accuracy and timeliness by the Engineer or County Project <br /> Manager. Upon completion of the Project, the BV Contractor will be evaluated based on their <br /> performance during the entire Project. This includes (but is not limited to): overall quality, on- <br /> time completion, no cost change orders, no complaints, and submission of accurate information. <br /> The final rating will be used to mods the General Contractors PPI scores by 50%. The <br /> modified rating will be used for competition on future Projects. <br /> P <br /> POST PROJECT EVALUATION <br /> Upon completion of the Project, the BV Contractor will be evaluated based on their performance �I <br /> on the Project. This includes (but is not limited to): overall quality, on-time completion, no cost i <br /> change orders, no complaints, and submission of accurate weekly reports. The final rating will [[ <br /> be used to modify the Project Team's PPI scores by 50% (including the Critical Team Members). t <br /> The BV Contractor shall be assigned a score of 10 at the start of the Project as they have <br /> demonstrated abilities that acknowledge their status as a high performing contractor through the <br /> Solicitation phase. Adjustment of this score to a 5 or a 1 will be dependent on information <br /> contained within the weekly Risk Report. <br /> SECTION 7- SUBMITTAL FORMAT AND GENERAL INFORMATION <br /> SUBMITTAL FORMAT <br /> 21 <br /> 1 -72- ' 2,1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.