CONSENT APENDA <br />BID RESULTS: <br />Bids received were: <br />*Mathematical errors noted during bid evaluation. Corrected bid prices are retiectea anove. <br />The Engineering Division reviewed bids and has determined Summit Construction of Veno Beach, <br />LLC to have submitted the lowest most responsive and responsible bid. <br />ENGINEER'S ESTIMATE: <br />The engineer's estimate for the work, including alternates was $196,728. Some cost savings can be <br />realized if County staff is utilized for completion of required record drawings/as-built drawings by <br />(bid item 3) and construction of two concrete benches (bid item 17). These items accounted for <br />$3,570 and $4,200, respectively, on the overall low bidder's itemized bid schedule. Deduction of <br />these items from the total bid price would result in an overall cost savings of $7,770, and reduce <br />the overall project cost to $378,742.36. <br />SOURCE OF FUNDS: <br />Funding in the amount of $160,000 has previously been approved for the original scope of the project <br />from Optional Sales Tax. Due primarily items added by County staff in response to feedback received <br />from the community leaders, additional funding of approximately $220,000 is needed for the''proposed <br />project. Staff recommends utilizing Optional Sales Tax Cash Forward to fund the differential. <br />Account Number Account Description Budget Am unt <br />315039-389040 Optional Sales Tax — Cash Forward Oct. 1 $30,000 <br />F:\Budget\Jason\agenda 201314\Gifford Ballfield Bid Award Agenda -2014015. doc <br />114 <br />Alternate 1 <br />Alternate 2 <br />Total Bid <br />Bidder <br />Location <br />Base Bid Price <br />(lights and <br />(two storage <br />(with <br />Installation) <br />sheds) <br />alternates) <br />Santa Cruz <br />Merritt <br />$395,173.00* <br />$91,100.00 <br />$34,800.00 <br />$521,073.00 <br />Construction Inc. <br />Island <br />Sports Turf One, <br />Boynton <br />$273,459.49 <br />$51,804.00 <br />$72,940.00 <br />$398,203.49 <br />Inc. <br />Beach <br />Summit <br />Construction of <br />Vero <br />$345,352.36 <br />$10,500.00 <br />$30,660.00 <br />$386,512.36 <br />Beach <br />Vero Beach, LLC <br />Sunshine Land <br />Stuart <br />$337,648.11 <br />$56,658.25 <br />$60,984.00 <br />$455;290.36 <br />Design, Inc. <br />Timothy Rose <br />Vero <br />$344, 254.66* <br />$17,520.00 <br />$27,110.52 <br />$388885.18 <br />Contracting, Inc <br />Beach <br />*Mathematical errors noted during bid evaluation. Corrected bid prices are retiectea anove. <br />The Engineering Division reviewed bids and has determined Summit Construction of Veno Beach, <br />LLC to have submitted the lowest most responsive and responsible bid. <br />ENGINEER'S ESTIMATE: <br />The engineer's estimate for the work, including alternates was $196,728. Some cost savings can be <br />realized if County staff is utilized for completion of required record drawings/as-built drawings by <br />(bid item 3) and construction of two concrete benches (bid item 17). These items accounted for <br />$3,570 and $4,200, respectively, on the overall low bidder's itemized bid schedule. Deduction of <br />these items from the total bid price would result in an overall cost savings of $7,770, and reduce <br />the overall project cost to $378,742.36. <br />SOURCE OF FUNDS: <br />Funding in the amount of $160,000 has previously been approved for the original scope of the project <br />from Optional Sales Tax. Due primarily items added by County staff in response to feedback received <br />from the community leaders, additional funding of approximately $220,000 is needed for the''proposed <br />project. Staff recommends utilizing Optional Sales Tax Cash Forward to fund the differential. <br />Account Number Account Description Budget Am unt <br />315039-389040 Optional Sales Tax — Cash Forward Oct. 1 $30,000 <br />F:\Budget\Jason\agenda 201314\Gifford Ballfield Bid Award Agenda -2014015. doc <br />114 <br />