Laserfiche WebLink
Projecti ope and Budget imentA <br /> Construction Materials Testing and Inspection <br /> CR 512 Resurfacing Project <br /> Indian River County,Florida <br /> Project Name: CR 512 Resurfacing IRC Project#1132 Dunkelberger Engineering&Testing,Inc. <br /> Client: Indian River County Attn:Mr.Christopher J.Kafer,P.E. 607 NW Commodity Cove <br /> Dunkelberger Project#: PSL-09-3054(BG 14,1) Port St.Lucie, Florida 34986 <br /> Date: May 17,2013 (772)343-9787 FAX(772)343-9404 Contact: Xiaoyan(Sue)Zheng, P.E.,PhD <br /> Contract Amount a Remainin on Contract <br /> nize'di I moun moun , <br /> Field Sampling and Testing <br /> Sr.Engineering Technician" 250 hour $55.00 $13,750.00 989 $9 99 A $9 89 &98 $898 250 $13,750.00 <br /> (includes In-place density testing) <br /> I <br /> Laboratory Testing" { <br /> Maximum Density(T-180[Proctor test]) 18 each $86.00 $1.548.00 8 5989 8 $8:8o 8 $889 18 $1,548.00 <br /> Full Sieve Analysis(T-27) 18 each $65.00 $1,170.00 9 $988 8 $9:99 9 $8:89 18 $1,170.00 <br /> I <br /> i <br /> Asphalt Plant Testing <br /> FDOT CTAP certified plant Inspector 40 hour $55.00 $2,200.00 9:99 x9:99 9 $999 9:99 $G.N 40 $2,200.00 <br /> Engineering&Reporting <br /> 40 $3,800.00 <br /> Project Engineer 40 hour $95.00 $3,800.00 A $9 98 8 $A 8A 8 $898 <br /> Perform sampling and testing,and construction inspection of FDR and AC,assume 15 days of FDR and 10 days of paving @10 hrs/day <br /> The maximum density testing involves the laboratory density determination of the field-prepared FDR mixture with emulsions. <br /> Estimated Total $22,468.00 $A:88 som $0.00 $22,468.00 <br /> 0 3054(14.1).CR 512 QA with field inspection.As <br />