Laserfiche WebLink
omitted altogether from the Contract. In addition some savings <br />could be obtained by having the county provide the asphalt paving <br />under our current contract rather than the low bidder's proposal. <br />This approach would, however, reduce the Contract amount. The <br />contractor is agreeable to this, if a negotiated change order is <br />executed with him to provide the reduced playground equipment. <br />Delete <br />Contract <br />Amount Savings <br />In Summary: <br />Delete: <br />Item No. 17 Parking Area <br />Lighting -$ 23,027.00 $ 23,027.00 <br />Reduce: <br />Item No. 21 Playground Area <br />Sand Base -$ 19,905.00 <br />Item No. 22 Playground <br />Equipment -$ 63,469.00 <br />(Reduce both by... $ 33,500.00 <br />for a total equal <br />to or less <br />than $39,877) <br />Have County Perform: <br />Item No. 4 Asphaltic Cement <br />Pavement -$ 30,745.50 $ 14,584.00 <br />Item No. 9* Asphaltic <br />Cement Bikepath <br />Pavement -S 6.364.80 $ 2.784.60 <br />Deletion Total....... -$143,511.30 <br />'I <br />Reduced Contract Amount $663,125.46 ($806,636.76-$143,511.30) <br />Total Project Savings ..............$ 73,895.60 <br />Total Projected Reduced Project Cost: <br />$663,125.46 Contract with Hunley-Hubbard (as <br />Required.amount for South County Project $850,130.97 <br />By using General Fund contingency funds along with other funds, the <br />reduced Contract and project can be funded. <br />ALTERNATIVES: <br />Alternative. No. l - Reduce the Contract and fund as set out in the <br />Discussion & Analysis. <br />Alternative No. 2 - Fund the entire Contract ($806,636.76) using <br />funds that are available, including contingency funds, to make up <br />the difference in the budget and the Contract amount. <br />Alternative No. 3 - Re -bid the Contract, deleting the items and <br />reducing the scope of work. <br />BUDGETED AMOUNT: $600,000.00 <br />RECOMMENDATION: <br />Staff recommends awarding the low bid to Hunley-Hubbard at the bid <br />amount of $806,636.76, then delete items 4, 9, 17, 21 & 22, by <br />change order, and in addition, negotiate a change order to provide <br />reduced playground equipment installation. The reduced contract <br />would then be for $663,125.46. Allocate contingency funds of <br />$181,005.97 to fund a reduced project. <br />37 <br />AUG 7�c:,il <br />reduced by change order) <br />$ 39,877.00 <br />Playground Change Order ` <br />$ 12,701.14 <br />In Kind Costs (to date) ' <br />$ 57,085.67 <br />Rental Fees, Landfill Fees (to date) <br />$ 20,000.00 <br />Grading Labor & Equipment Charge <br />$ 19,741.70 <br />Paving <br />S 37.600.00 <br />Contingencies at 5% <br />$850,130.97. <br />Required Project Amount <br />$669,125.00 <br />Budgeted Funds <br />$181,005.97 <br />General Fund Contingency Funds Needed <br />Required.amount for South County Project $850,130.97 <br />By using General Fund contingency funds along with other funds, the <br />reduced Contract and project can be funded. <br />ALTERNATIVES: <br />Alternative. No. l - Reduce the Contract and fund as set out in the <br />Discussion & Analysis. <br />Alternative No. 2 - Fund the entire Contract ($806,636.76) using <br />funds that are available, including contingency funds, to make up <br />the difference in the budget and the Contract amount. <br />Alternative No. 3 - Re -bid the Contract, deleting the items and <br />reducing the scope of work. <br />BUDGETED AMOUNT: $600,000.00 <br />RECOMMENDATION: <br />Staff recommends awarding the low bid to Hunley-Hubbard at the bid <br />amount of $806,636.76, then delete items 4, 9, 17, 21 & 22, by <br />change order, and in addition, negotiate a change order to provide <br />reduced playground equipment installation. The reduced contract <br />would then be for $663,125.46. Allocate contingency funds of <br />$181,005.97 to fund a reduced project. <br />37 <br />AUG 7�c:,il <br />