Laserfiche WebLink
NOV 2 6 091 <br />BOCiK P�?UES <br />9. Stormwater Management: A conceptual stormwater management <br />plan has been reviewed and approved by the Public Works <br />Department. <br />10. Landscape Plan: The applicant has noted on the conceptual <br />plan that a landscape plan meeting the criteria of chapter 926 <br />will be submitted with the final site plans(s). <br />The conceptual plan indicates that a 30' buffer strip of <br />existing native vegetation (predominantly palmetto) will <br />remain undisturbed along the west and north property lines. <br />These natural buffers will exceed the minimum criteria for a <br />type "C" buffer which is required to be placed between the <br />proposed use and the adjacent single family residences. In <br />addition, all structures are set back at least 100' from the <br />west property line, with the parking lot set back 80' from the <br />west property line. Furthermore, the fenced playground area <br />is to be located approximately 170' from the west property <br />line. The phase II additional outdoor play area must be set <br />back 50' from the west property line, and 30' from the south <br />property line. These buffers and setbacks are required to <br />buffer surrounding residences from proposed buildings, parking <br />areas, and outdoor recreation areas. <br />11. Utilities:' The project will <br />services. The applicant has <br />to the site; the concurrency <br />is available.._ ___ _ <br />connect to City water and sewer <br />indicated services are available <br />review has verified that capacity <br />12. Dedication and Improvements: The comprehensive bikeway and _ <br />sidewalk plan requires that a 5' wide public sidewalk be <br />constructed along the project's 43rd Avenue frontage. The <br />applicant has indicated that the sidewalk will be provided <br />with phase I. <br />The Thoroughfare Plan classifies 43rd Avenue as a minor <br />arterial which requires 100' of right-of-way. Presently 70' <br />of right-of-way exists for 43rd Avenue. The applicant will <br />need to dedicate 15' of property for 43rd Avenue right-of-way <br />subject to compensation. The property will need to be <br />dedicated prior to release of the approved final site plan. <br />13. Concurrency: A conditional concurrency application has been <br />approved for the proposed development. <br />14. Airport Concerns: At the October 10, 1991 Planning and Zoning <br />Commission meeting, the planning staff recommended approval of <br />this request, even though planning staff was aware that the <br />airport director had concerns about the proposed use in <br />relation to noise generated from the nearby airport. In <br />telephone conversations and in meetings, the airport staff had <br />indicated that the proposed use would need to comply with the <br />Code of Federal Regulations (CFR), Part 150, Appendix A <br />standards. These standards deal primarily with how airport <br />noise will affect surrounding uses. In planning staff's <br />opinion, CFR part 150 did not prohibit the proposed use at <br />this location, but did indicate that extra noise attenuation <br />building construction measures would need to be taken by the <br />applicant to accommodate the users of the proposed school. <br />During the site plan review process, the applicant indicated <br />that she was willing to take such building construction <br />measures and was also willing to execute an "avigation <br />easement." Such an easement protects the airport from <br />possible lawsuits by having the prospective owner of the <br />subject property acknowledge that she is aware of the airport - <br />generated noise. Also, the easement essentially waives the <br />property owner's rights to bring legal action against the <br />"airport in relation to noise and any perceived nuisances <br />generated by airport operations. <br />3 <br />28 <br />