My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2/18/1992
CBCC
>
Meetings
>
1990's
>
1992
>
2/18/1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:03:30 PM
Creation date
6/16/2015 11:07:33 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
02/18/1992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FEB 18 `99 <br />BOOK �-, � F;,;;E 6 0 i <br />Commissioner Scurlock said he posed very specific questions to <br />Mr. Prince and Mr. Clem and the answers were not sufficient to <br />overcome his concerns. Commissioner Scurlock felt Guettler is the <br />more responsible bidder because our experience with Guettler has <br />been favorable. <br />Chairman Eggert stated her only conversation with Mr. Clem was <br />when he called to say he would deliver some material to her office, <br />and she told him she would come in early to read it. She <br />understood about exceeding the criteria but was troubled by the <br />extent of the people contacted and the problems disclosed versus <br />the low bid. <br />Commissioner Bird was concerned with getting this project <br />started immediately because we are committed to having this course <br />open for play in the winter of 1993. Failing that, we will lose as <br />much as $40,000 to $50,000 per week in additional revenue. P Because <br />of the time constraint, Commissioner Bird felt more confident going <br />with a known quantity, Guettler & Sons, Inc., which has done local <br />jobs, including the first Sandridge golf course. <br />Chairman Eggert asked if Commissioner Bird felt there was a <br />certain danger with Prince Construction getting it done. <br />Commissioner Bird believed Mr. Prince's word that he can do <br />this job under the time constraint, but because of Guettler's <br />additional construction experience he would support the staff <br />recommendation. <br />THE CHAIRMAN CALLED FOR THE QUESTION. <br />It was voted on and carried 3-2, Commissioner <br />Wheeler and Chairman Eggert voting in opposition. <br />CONTRACT IS ON FILE IN THE OFFICE OF <br />CLERIC TO THE BOARD <br />NORTH COUNTY SEWER "REFLECTIONS LIFT STATION" CONNECTION TO COUNTY <br />SYSTEM <br />The Board reviewed memo from Utility Services Director Terry <br />Pinto dated February 10, 1992: <br />48 <br />
The URL can be used to link to this page
Your browser does not support the video tag.