Laserfiche WebLink
APR 211992 BOOK 66 <br />Commissioner Scurlock announced that he has talked to the <br />County Attorney's office and he has no conflict of interest in this <br />matter and plans to vote on the issue. <br />ON MOTION by Commissioner Bird, SECONDED by <br />Commissioner Bowman, the Board unanimously approved <br />staff's recommendation of Alternate No. 1 to approve <br />Guettler & Sons' final pay request in the amount of <br />$8,270 and withhold $450 as liquidated damages for <br />failure to complete within 100 calendar days. <br />COPY OF CHANGE ORDER #4 (FINAL PAY REQUEST) IS ON FILE IN THE <br />OFFICE OF THE CLERK TO THE BOARD <br />INDIAN RIVER BOULEVARD PHASE III - CHANGE ORDERS NO. 6 AND 7 <br />The Board reviewed the following memo dated 4/10/92: <br />TO: James E. Chandler, <br />County Administrator <br />THROUGH: James W. Davis, P <br />.E., .ti <br />Public Works Director <br />�'!� <br />FROM: Terry B. Thompson, P.E. <br />Capital Projects Manager <br />SUBJECT: Indian River Boulevard, Phase III <br />Change Order No. 6 and No. 7 <br />DATE: April 10, 1992 <br />DESCRIPTION AND CONDITIONS <br />FILE: irb3co6/7.agn <br />During the construction of - Indian River Boulevard, <br />unsuitable soils and limerock have been encountered. Since <br />these materials were not shown on the original drawings, <br />change orders have been necessary during the earthwork and <br />pile driving phases. <br />The pre -design geotechnical firm, Universal Engineering <br />Services, is of the opinion that the soil borings they <br />Provided to Boyle Engineering adequately reflect subsurface <br />areas of consolidated materials and unsuitable soils. The <br />attached letter from Ron Barnett of Boyle Engineering dated <br />Jan. 29, 1992 explains why the contract documents did not <br />reflect the conditions that have been encountered. <br />The attached Change Order No. 6 includes increases in the <br />amount of $45,706.25 for pre -drilling pile holes through <br />rock, removing rock under structures, and excavation, <br />hauling and disposal of unsuitable material. Various other <br />incidental items bring the total increase amount to <br />$53,729.69. <br />C:i] <br />