My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/5/1992
CBCC
>
Meetings
>
1990's
>
1992
>
5/5/1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:03:31 PM
Creation date
6/16/2015 10:56:21 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
05/05/1992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fr - <br />MAY 0 5 1992 <br />ANALYSIS: <br />1. Size of Development: ROOK G <br />Phase I: <br />Parcel 1: 10.33 Acres (part of Phase I) <br />Marina Basin: 24.07 Acres (part of Phase I) <br />Sub -Total: 34.40 Acres (total of Phase I) <br />Phase II: <br />Parcel 2: 29.91 Acres (total of Phase II) <br />Total of Phase I and II: 64.31 Acres (Overall <br />Conceptual Plan, <br />Total of Phases I and II) <br />2. Zoning Classification: <br />16.20 Acres: RM -61 Residential Multi -family District <br />(up to 6 units per acre) <br />48.11 Acres: CG, General Commercial (up to 8 units per <br />acre density allowed) <br />3. Land Use Designation: <br />16.20 Acres: L-2, Low -Density Residential (up to 6 <br />units per acre) <br />48.11 Acres: C/I, Commercial/Industrial <br />4. Residential Density: <br />Phase I: 79 units/34.40 acres a 2.3 unit/acre <br />Phase II: 402 units/29.91 acres a 13.4 units/acre <br />Overall: 481 units/64.31 = 7.5 units/acre <br />Maximum units allowed by zoning: 482 units <br />5. Commercial Development: <br />Phase I: none <br />Phase II: 113,000 sq. ft. (Maximum potential) <br />Overall: 113,000 sq. ft. (Maximum potential) <br />6. Impervious Area: <br />Phase I: 222,577 sq. ft. or 14.8% of total development <br />area (marina not counted as impervious) <br />Phase II: up to 941,331 sq. ft. or 72% <br />Overall Project: up to 1,163,908 sq. ft. or 66.5% of the <br />buildable area <br />7. Open Space required: <br />Note: <br />Overall Project Required: 30% of 64.31 acres or <br />840,404 sq. ft. <br />[Note: the P.D. ordinance requires 30% open space] <br />Overall Project Provided: 30% of 64.31 acres or <br />840,404 sq. ft. <br />Phase I Proposed: 362,250 sq. ft. or 24.1% of Phase I <br />area of -development <br />Phase II Proposed: 478,154 sq. ft. or 36% of the Phase <br />II area development - <br />The marina basin can count for up to 30% of the <br />amount of total required open space. The overall <br />Project effective green area requirement is 13.5 <br />acres or 588,282 sq. ft. in addition to 216,122 sq. <br />ft. of water body open space credit. <br />30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.