My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/5/1992
CBCC
>
Meetings
>
1990's
>
1992
>
5/5/1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:03:31 PM
Creation date
6/16/2015 10:56:21 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
05/05/1992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8. Traffic Circulation: The project site can be accessed througn <br />the main Grand Harbor U.S. #1 entrance or from 53rd Street. <br />The applicant is proposing a 24' wide paved access road to <br />directly access the clusters of condominium buildings <br />contained within the project site. The interior traffic <br />circulation within the building clusters will be provided by <br />24' driving aisles, which will provide access to all parking <br />spaces. <br />9. Off -Street Parking: <br />Phase I Required: 158 spaces <br />Phase I Provided: 171 spaces <br />Note: These spaces will be provided in a combination of <br />garage, trellis, and open parking spaces. <br />Phase II Required: <br />10. Stormwater Management: <br />Residential uses require 2 spaces <br />per unit. Any commercial use will <br />require subsequent approval of P.D. <br />plans which provide for the <br />appropriate number of spaces, which <br />varies by specific commercial use <br />category. <br />Phase I: A detailed stormwater management plan has not been <br />submitted or approved by the Public Works <br />Department but will be reviewed and approved <br />through the land development permit process. <br />However, Public Works has reviewed and approved the <br />conceptual drainage plan submitted with the subject <br />request and has no objections to conceptual and <br />preliminary P.D. plan approval. <br />Phase II: A conceptual stormwater management plan for the <br />overall development has been reviewed and approved <br />by the Public Works Department. <br />11. Landscape Plan: The landscape plan is in conformance with <br />Chapter 926 requirements and provides for the required 25' <br />buffer along the perimeter of the project.. The plan also <br />provides for an upland edge transitional planting adjacent to <br />estuary areas, as required by the DRI development order. <br />Where the 25' perimeter buffer is provided "off-site" on <br />adjacent property under the developer's control, the buffer <br />will be legally tied to this project via a covenant which will <br />be filed along with the P.D. final plat. A Type "C" buffer <br />strip is required to be provided within the' 251 perimeter <br />buffer where commercial uses are proposed adjacent to <br />residential uses on the project's perimeter. <br />Irrigation, grading and planting details of the upland edge <br />transitional, zones will need to be provided with the land <br />development permit application. The upland planting details <br />will need to be approved by the Environmental Planning Section <br />prior to issuance of a land development permit. <br />12. Utilities: The project will be served by County water and <br />sewer -services. The utility services plan has been approved <br />by the County's Department of Utility Services. <br />31 <br />MAY 0 5 199 <br />
The URL can be used to link to this page
Your browser does not support the video tag.