Laserfiche WebLink
BOOK 6 <br />Director Davis clarified that Road and Bridge Division trucks <br />will continue to haul the fill unless they are needed for other <br />projects and then Sheltra's trucks will be used on an as -needed <br />basis. <br />Commissioner Scurlock led discussion regarding quantities of <br />fill that have been moved and estimated quantities to be moved. <br />Director Davis reported that his estimate was over 16,000 and <br />possibly 20,000 cubic yards have been moved. The final figures <br />could not be determined until the final lake is excavated and all <br />the material moved, but he estimated 30,000 to 40,000 cubic yards <br />will be moved. <br />Commissioner Scurlock cautioned that before all the fill is <br />moved off the golf course site that staff check to see that our <br />elevations are correct, and Director Davis confirmed he would check <br />that out. <br />ON MOTION by Commissioner Wheeler, SECONDED by <br />Commissioner Bowman, the Board unanimously (4-1, <br />Commissioner Bird being absent) approved the use of <br />Sheltra & Son Construction Co. Inc., to haul fill <br />from the Second 18 golf course site to Indian River <br />Boulevard Phase 4 site, as outlined in Alternative 1 <br />in staff's memo. <br />ENGINEERING FIRM SELECTION - ROSELAND WATER TOWER <br />The Board reviewed memo from Utility Services Director Terry <br />Pinto dated May 5, 1992: <br />32 <br />