Laserfiche WebLink
WEST REGIONAL WASTEWATER TREATMENT PLANT REGIONAL FORCE MAIN <br />The Board reviewed memo from Utility Services Director Terry <br />Pinto dated June 10, 1992: <br />DATE: JUNE 10, 1992 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />FROM: TERRANCE G. PINTG.-Ir <br />DIRECTOR OF UTILITY SERVICES <br />PREPARED WILLIAM F. J49CAIN <br />AND STAFFED CAPITAL PR CTS GINEER <br />BY: DEPARTMEILITY SERVICES <br />SUBJECT: WEST REGIONAL WASTEWATER TREATMENT PLANT (WR WWTp) <br />REGIONAL FORCE MAIN <br />INDIAN RIVER COUNTY PROJECT NO. US -87 -07 -DC <br />BACKGROUND <br />On November 27; 1990, the Indian River County Board of County <br />Commissioners approved Addendum No. 2 to Work Authorization No. 11 <br />with Masteller and Moler, Inc. (see attached agenda item and <br />minutes). This -Work Authorization included the design of a 24 -inch <br />diameter force main from the WR WWTP south to 4th Street, east on <br />4th Street to 82nd Avenue, including a large canal crossing design. <br />As a result of permitting interaction with the Indian River Farms <br />Water Management District, we have been instructed to combine <br />several of our proposed canal crossings into one. After meeting <br />with the engineers of the affected projects, we determined that the <br />least expensive and most desirable modification was to relocate and <br />expand the crossing designed by Masteller and Moler, Inc. For a <br />detailed description of services, please see "Project Description" <br />on the attached Addendum No. 2. <br />ANALYSIS <br />The proposed Addendum No. 2 reflects additional surveying, design <br />and permitting, and does not include any additional inspection. The <br />proposed cost for these additional engineering services is <br />$4,200.00, which the Utilities staff feels is justified. <br />RECOMMENDATION <br />The staff of the Department of Utility Services recommends that the <br />Board of County Commissioners approve the attached Work <br />Authorization with Masteller and Moler, Inc., in the amount of <br />$4,200.00. <br />ON MOTION by Commissioner Scurlock, SECONDED by <br />Commissioner Bowman, the Board unanimously approved <br />the Work Authorization with Masteller & Moler, Inc., <br />in the amount of $4,200.00, as recommended by staff. <br />ENGINEERING WORK AUTHORIZATION <br />IS ON FILE IN THE OFFICE OF CLERK TO THE BOARD <br />61 <br />I <br />JUL 0 71992 <br />