Laserfiche WebLink
� r � <br />EXTENSION OF WATER SERVICE TO THE AREA WEST OF THE MIDDLE SCHOOL ON <br />COUNTY ROAD 512 <br />The Board reviewed the following memo dated 7/29/92: <br />DATE: JULY 29, 1992 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />FROM: TERRANCE G. PINTO <br />DIRECTOR OF UTI T RVICES <br />SUBJECT: EXTENSION OF WATER SERVICE TO THE AREA WEST OF THE <br />MIDDLE SCHOOL ON -COUNTY ROAD 512 <br />BACKGROUND <br />The County Commission previously approved the construction of water and <br />sewer lines to serve the new high school on County Road 510 and the <br />middle school on County Road 512. That project will be under <br />construction within the next 60 days. <br />There is some interest to extend both water and sewer lines west of the <br />middle school on County Road 512 to Interstate 95. <br />be master lines funded from impact fees. Their rimary p lines would <br />would <br />be to service the industrial area on County Road 510,utheSeWayfara <br />Restaurant, and Sunshine Travel Park. Sunshine Travel Park presently <br />has a franchise which required a letter of credit to pay $363,280.00 <br />for impact fees. <br />ANALYSIS <br />The Utilities Department will have the water main extension to the <br />schools under construction within 60 days. All the engineering was <br />completed in-house. We contracted out only the surveying. <br />Utilities expansion into that area would promote growth of the <br />industrial area and also make utilities available so three package <br />treatment plants could be eliminated. <br />102nd Terrace which runs north from County Road 512 into the industrial <br />zone could be served by an assessment project. <br />RECOMMENDATION <br />The Department of Utility Services re <br />estsCommission for authorization of engineerin aforoval thefdesign County <br />extension of the utility lines from County Road 512 to Interstatef95tto <br />be funded by an assessment, and design of utility lines for 102nd <br />Terrace to be funded by impact fees. <br />Both projects are to be brought back to the Board after design with the <br />final cost estimate for authorization to bid. <br />33 <br />BOOK 8'1 [Aa <br />