My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1984-18
CBCC
>
Ordinances
>
1980'S
>
1984
>
1984-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2019 12:00:26 PM
Creation date
2/1/2017 12:31:15 PM
Metadata
Fields
Template:
Ordinances
Ordinance Number
1984-18
Adopted Date
04/04/1984
Ordinance Type
Water and Sewer
State Filed Date
04\27\1984
Entity Name
Sewer Connections
Impact Fees
Subject
Utilities (Water and Sewer) Connections
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J <br />article, the term off-site shall defined as those mains, water <br />transmission lines, sewage collection lines, sewage force mains <br />and/or pumping stations necessary to connect to the developer's <br />property with facilities of the County adequate in size to trans- <br />mit to the developer's property an adequate quantity of water <br />under adequate pressure and/or transmit sewage collected on the <br />developer's property to the treatment plant or disposal site of <br />the County. It is the County's policy to expand its water and <br />sewerage system in an orderly, economical manner and in those <br />cases in which the County would not normally be expanding its <br />system to serve a developer's project at that time and such an <br />extension would require an extraordinary expenditure by the County <br />for transmission facilities and such expenditure does not fall <br />within the "norm" associated with the County's standard impact fee <br />then such developer shall be required to construct or pay the cost <br />of off-site facilities associated with his project. In this <br />event, the County shall negotiate an agreement with the developer <br />requesting service setting forth the developer's responsibility <br />for off-site facilities and the County's responsibility for <br />requiring such facilities to be oversized to meet future demands. <br />B. Refundable advances. The County may require, in <br />addition to the contribution in aid of construction of off-site <br />facilities herein set forth, a refundable advance by the developer <br />to further temporarily defray the cost of any "off-site" extension <br />of water and/or sewer mains and pumping stations necessary to <br />connect the developer's property with the then terminus of the <br />County's water and sewer facilities. This provision recognizes <br />instances in which a developer may be required to advance funds to <br />construct off-site facilities sized in accordance with the , <br />County's Master Plan. All amounts expended by the developer pur- <br />suant to such an agreement over and above the developer's <br />hydraulic share for off-site facilities shall be refunded to <br />developer in accordance with the terms and conditions of a <br />refunding agreement which the County will execute with the <br />developer. County may assume a portion of the material cost of <br />such projects when it deems it to be in the best interest of the <br />-16- <br />
The URL can be used to link to this page
Your browser does not support the video tag.