My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-304
CBCC
>
Official Documents
>
1990's
>
1997
>
1997-304
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2018 2:41:17 PM
Creation date
2/8/2017 9:30:59 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/04/1997
Control Number
97-304
Entity Name
Waste Management of Florida
Subject
Operation Class 1 Landfill
Construction and Partial Closing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
111 <br />11. SECTION 2.4 - SEEDING <br />Part 1 General <br />a <br />3 <br />v <br />1.01 Scope <br />a. This section specific materials and procedures for seeding short-term and long-term grass <br />covered areas as required for soil erosion control. It also identifies areas requiring sod. <br />b. The following areas will IIQI require seeding: <br />1. Active borrow areas and earth haul routes. <br />2. The daily cover on top of landfill lifts that have not received 6 inches of <br />intermediate top cover. <br />c. The following areas shall be seeded for short-term cover (temporary seeding): <br />1. Intermediate cover on the slope of fill at completion of filling of the phase. <br />2. Inactive borrow areas as directed by County. <br />3. Any other areas requiring seeding that will be disturbed again within 180 days of <br />seeding. <br />d. The following areas shall be seeded with long-term cover (permanent seeding): <br />1. All intermediate cover on top of completed phases which will not undergo final <br />closure within 180 days. <br />2. Shallow drainage ways where grass cover was disrupted by solid waste filling or <br />earth moving operations. <br />3. Any other areas, except drainage ways, which require seeding that will not be <br />disturbed for 12 months or longer after seeding. <br />e. All seeded areas shall be mulched or use erosion control matting as specified in 1.03(e). <br />f. Topsoil shall be provided prior to long-term seeding. <br />g. The following area will be sodded: <br />1. All slopes 3:1 horizontal/vertical in drainage ditches <br />2. Side slopes of Class I Landfill which are 3:1 (horizontal to vertical) and upon <br />which it is not possible to establish cover by seed or natural plant seeding. <br />2.4-1 <br />bp06571111.111.97 <br />
The URL can be used to link to this page
Your browser does not support the video tag.