Laserfiche WebLink
S` � �� Y1 t:(i 4'i/2. 1 f7 }�r?� Edi £i4, i 4T U'�t{,s�f�'' =." "`i. '(.t5'• '1 <br />(oto ff an } )" r,Y `'�i.,,.L'x>'Y� <br />�'��rCt�'✓bn::�40�4Yq�u�a'"i:�ix �F:•.:N ," ��%«1�s,� <br />r;{^Fig;; <br />y4�ci �'f1 24x <br />tr'-.�a� "�R a5%�yy��'��� <br />����l'Sri�.: 't�f. �x �dx'�.� �'35.•l9 <br />Sodding shall be used at the discretion of the Contractor's Landfill <br />Superintendent. Contractor shall sod areas of the active landfill as directed by the <br />Solid Waste Disposal District Director for erosion control. <br />3. The Contractor shall not be required to sod areas of the landfill at final grade, <br />which will be closed in future phased closure construction projects, except for the <br />purpose of erosion control. <br />4. The Contractor shall place sod for maintenance of closed portions of Segment I <br />and Segment II. <br />1.02 Maintenance <br />a. Areas of short-term cover shall be maintained through germination and establishment and <br />for the duration of the cover until redisturbed for landfill operations. <br />b. Areas of long-term cover shall be maintained through germination and establishment and <br />for the duration of the cover until redisturbed for landfill operations. Areas of permanent <br />cover, i.e., areas of final grade that are seeded for long-term cover and would not be <br />disturbed again during the period of this Agreement, shall be maintained for the duration <br />of this Agreement. <br />c. Maintenance shall include repair of erosion damage, reseeding, maintenance of mulch, <br />and resodding. <br />1. Original grades of the grass areas shall be maintained after commencement of <br />seeding operations and sodding and during the maintenance period. Any damage <br />to the finished surface by erosion or other causes shall be promptly repaired. <br />2. Mulch and/or erosion control fabric shall be maintained until overgrown by grass <br />seedlings. Material that has been removed from the site by wind, water, or other <br />forces shall be replaced and secured. <br />3. Watering will not be required unless directed by the Solid Waste Disposal District <br />Director or his designee for protection of seed or sod. The Contractor shall <br />provide equipment and water. The Contractor will make provisions for watering <br />when it is needed. The Contractor shall be fully responsible for maintenance of <br />grades and control of erosion by seeding or sodding. The Contractor may elect to <br />water seeded areas or sodded areas, when not directed by the County. No <br />payment allowance will be made by the County to expedite germination and <br />establishment of the cover. <br />2.4-2 <br />dee ;,rte zeaa uae a son m r rrsrig x-.=,n,..ax4- .M 7• :,LIZIMM..T.TA ^ r IPIPPARMENC:S IEWI•!aF ARIA.1- <br />ep16rnw•re•vr <br />