Laserfiche WebLink
Infill Segment Construction and Partial Closure of the Segment II Class I Landfills will be <br />performed under a separate Contract in accordance with the Contract Forms and Specifications <br />for the Class I Landfill Infill - Segments I and IT. <br />ARTICLE q <br />COMPENSATION <br />In consideration for the services provided herein, the SWDD shall pay to the Contractor, and the <br />Contractor shall accept as compensation therefore, the following price (subject to adjustment as <br />provided in the Contract Documents: <br />Base Bid <br />Item No. 1 <br />One million twenty-one thousandfour hundred forty-nine Dollars and 00/100 <br />cents 01.021.449.00) for Class I waste disposed of each year for five (5) years, <br />January 1 through December 31, within the range of 84,450 to 140,750 tons per <br />year at the Indian River County Class 1 Landfill. Cost shall include the cost for <br />post closure operation and maintenance of the Class I Landfills and the cost for <br />leachate treatment. This cost will be limited to escalation at 75% of CPI for the <br />last 4 years of the 5 year contract. <br />Item No. 2 - Class I infill segment lateral and vertical expansion, including site preparation. <br />demolition, subbase compaction, procurement and transportation of suitable clay liner material. <br />installation of clay liner, geomembrane liners, geonets, geotextiles, leachate collection system, <br />placement of granular fill materials and quality control. Modification of existing Segment A, gas <br />vent system and dirt access roadway. Construction of replacement stormwater letdown structure <br />on Segment I, stormwater letdown structures on Segment II, and closure of north, south, and east <br />sides of Segment II to 55' NGVD terrace. Stormwater ditch alteration and roadway improvements <br />as needed for closure of lower portion of Segment II sideslope. Payment of Public Construction <br />Bond Premiums in consideration of indemnification of the Owner and Engineer as required in <br />General and Supplementary Conditions of the "Contract Forms" and specifications for the infill <br />construction and partial closure. The infill and partial closure construction shall be complete no <br />later than April 24, 1999, per the FDEP construction permit, or 365 calendar days after execution <br />of this contract, whichever occurs first. <br />For selling and delivering to the SWDD all necessary materials, equipment, supplies, and license <br />fees including installation of all materials, equipment, supplies. all other labor, excavating, filling, <br />permit fees, taxes insurance, general administration, mobilization/demobilization, and other <br />maintenance costs, overhead and profit for (1) infill segment lateral and vertical expansion <br />construction including Segment I sideslope and attachment to Segment II finer systems, including <br />clay subbase material and transportation and (2) for the Segment I stonnwater letdown <br />replacement, Segment II letdown and terminal ditch structures, closure of Segment II to 55' <br />NGVD, and associated ditch and permanent road improvements, and appurtenances, including <br />quality control. <br />A-2 <br />0 <br />Ai <br />1 <br />1 <br />1 <br />` 'x=�SP k REFITARK1 <br />4 <br />