My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-017
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2017 11:39:43 AM
Creation date
2/9/2017 11:39:42 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
02/07/2017
Control Number
2017-017
Agenda Item Number
8.J.
Entity Name
Kimley-Horn and Associates
Subject
Work Order No.9 Landscape Improvements
Area
S.County to Oslo Road
Project Number
1631
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Utility coordination letters will be submitted to franchise utility operators <br /> located within the corridor, requesting information on location, size, etc. <br /> related to existing utilities located in the corridor. The information <br /> obtained will be reflected in the 50%Submittal. <br /> 4. Overall project cost estimate, including maintenance of traffic, will be <br /> prepared -Submit two hard copies in 8%2" x 11" format. <br /> 5. Letters to billboard owners within the project limits will be submitted <br /> following COUNTY review of the 50%Submittal. <br /> The 90% and 100% Submittals shall include identifying the species/type, size, location, <br /> spacing and quality of all-plants. All plant material will consist of drought tolerant/ <br /> Florida-Friendly species. The Consultant shall include a written or graphic guide for care <br /> and maintenance associated with the plant material after the warranty period. The <br /> maintenance plan will be developed in coordination with the COUNTY who will assume <br /> maintenance obligation. The Landscape Plans will be developed so as to not require an <br /> automated irrigation system. <br /> 90%Submittal <br /> 1. A Comment/ Response letter will be prepared addressing each COUNTY <br /> 50%Submittal design review comment with a descriptive response. <br /> 2. Submit four 90% Submittal hard copy sets of the landscape plans and <br /> specifications in 11"x 17"format. <br /> 3. MOT plan sheets - Submit four final hard copy sets included in the <br /> landscape plans and specifications. <br /> 4. Letters of 'no conflict' from all utilities within the project limits - Submit <br /> two final hard copies of each in 8 %" x 11" format. Include any additional <br /> letters omitted in the first submittal.The Department must have two hard <br /> copies of all letters prior to the issuance of the Notice to Proceed with <br /> Construction. <br /> 5. Letters to billboard owners within the project limits-Submit two final hard <br /> copies of each in 8%" x 11"format. Include any additional letters omitted <br /> in the first submittal. <br /> 6. Overall project cost estimate, including maintenance of traffic, will be <br /> prepared -Submit two hard copies in 8%2" x 11" format. <br /> 100%Submittal <br /> 1. A Comment/ Response letter will be prepared addressing each COUNTY <br /> 90%Submittal design review comment with a descriptive response. <br /> 2. Submit four 100% Submittal hard copy sets of the landscape plans and <br /> specifications in 11" x 17" format. Plan sets shall be signed, sealed and <br /> dated if documents are created by a Landscape Architect. <br /> 3. MOT plan sheets-Submit four 100%Submittal hard copy sets included in <br />
The URL can be used to link to this page
Your browser does not support the video tag.