Laserfiche WebLink
Part 4- CONSULTANT will submit an updated closure plan.No significant changes will be made to <br /> the Closure Plan that was submitted in April 2011. <br /> Part 5- Financial assurance for closure and for 5 years of long-term care.A detailed closure and <br /> long-term care cost estimate for the C&D debris landfill will be prepared and submitted as <br /> part of the renewal application.The financial assurance documentation will also be sent to <br /> the FDEP Tallahassee office as part of the application. <br /> Part 6- A CCA treated wood management plan will be submitted as part of the renewal <br /> application.No changes will be made to the CCA Treated Wood Management Plan that was <br /> submitted in April 2011. <br /> Part 7- A groundwater monitoring plan.The Monitoring Plan Implementation Schedule(MPIS)for <br /> the Class I landfill includes the C&D landfill.A copy of the MPIS dated March 7,2011 will be <br /> submitted to meet this requirement. <br /> Part 8- Documentation to show that stormwater will be controlled.No change to the current <br /> stormwater system or Environmental Resource Permit(ERP)is anticipated and is not <br /> included in this Scope of Work.CONSULTANT will submit a copy of the current ERP to <br /> meet this requirement. <br /> Part 9- Documentation that shows how the Owner will comply with the temporary storage <br /> requirements of Rule 62-701.730(6),F.A.C.CONSULTANT will attach the required <br /> documentation necessary for this part to the permit renewal application. <br /> Part 10-Documentation that shows how the Owner will comply with the operation requirements of <br /> Rules 62-701.730(7), (18)and(19),F.A.C.CONSULTANT will attach the required <br /> documentation necessary for this part to the permit renewal application. <br /> Part 11-Documentation that shows how the Owner will comply with the training requirements of <br /> Rule 62-701.730(8),F.A.C.CDM Smith will attach the required documentation necessary <br /> for this part to the permit renewal application. <br /> Part 12-Documentation that shows how the Owner will comply with the closure and long-term <br /> care requirements of Rules 62-701.730(9)and(10),F.A.C.CONSULTANT will attach the <br /> required documentation necessary for this part to the permit renewal application. <br /> Part 13-Documentation that the Owner will comply with the annual report requirements of Rule <br /> 62-701.730(12),F.A.C.CONSULTANT will attach the required documentation necessary <br /> for this part to the permit renewal application. <br /> Part 14-A history and description of any enforcement actions by the applicant described in Chapter <br /> 62-701.320(3),F.A.C.relating to solid waste management facilities in Florida. <br /> CONSULTANT will prepare a narrative of the history and description the enforcement <br /> actions by the applicant. <br /> Under this subtask,CONSULTANT will participate in a teleconference pre-application meeting with <br /> FDEP. <br /> CDM <br /> Smith t■■ A-2 jj1994.docx <br />