Laserfiche WebLink
Subtask 1.2-C&D Debris Landfill Permit Renewal Water Quality Monitoring and Reporting <br /> CONSULTANT will perform the field testing,sample collection,and water-level measurements from <br /> the 10 C&D debris landfill groundwater monitor wells and background well MW-15,which will be <br /> performed in April 2017 (5 years after the previous renewal sampling event)in accordance with <br /> 62-701.730(8)(d),F.A.C.CONSULTANT will contract with Ideal Tech Services Inc.(ITS)to perform <br /> the groundwater sampling.The samples will be analyzed for the Permit Renewal Ground Water <br /> Monitoring Parameters in accordance with Paragraph 10 of the current Monitoring Plan <br /> Implementation Schedule,which was revised on March 7,2011. <br /> ENCO will perform the laboratory analysis under COUNTY's contract.The laboratory analytical <br /> reports will be submitted to FDEP as soon as possible after receipt of analytical reports. <br /> CONSULTANT will assist COUNTY in coordinating the analytical testing activities with ENCO,notify <br /> FDEP prior to sampling as required by the MPIS,review the analytical test results,and submit them <br /> as an attachment to the permit renewal application. <br /> Subtask 1.3-Submit Permit Renewal Application <br /> The following will be produced and submitted: <br /> ■ CONSULTANT will provide one draft copy of the landfill operations permit renewal application <br /> for COUNTY to review. <br /> ■ CONSULTANT will meet with COUNTY to review and discuss the comments on the draft permit <br /> renewal application. <br /> ■ CONSULTANT will prepare the final permit renewal application based on the comments <br /> obtained from COUNTY and submit the completed permit application and supporting <br /> documents to FDEP.CONSULTANT will submit four copies of the completed permit application <br /> to FDEP. <br /> ■ CONSULTANT will provide two copies of the permit application to COUNTY. <br /> ■ If requested by FDEP,CONSULTANT will provide supplemental information in order to <br /> complete the application.Field work is not included. <br /> ASSUMPTIONS <br /> ■ COUNTY will be responsible for permit application fees. <br /> ■ There have been no changes to the current Operations or Closure Plans. <br /> ■ Provisions for mining of the C&D debris landfill and processing will be added to the Operations <br /> Plan. <br /> ■ The proposed mining and processing operations can be performed without additional <br /> permitting(i.e.Processing Facility Permit). <br /> ■ If FDEP determines that the proposed mining and processing operations will require additional <br /> permitting,an Amendment to this Work Order,or a separate Work Order,will be required. <br /> ■ No additional survey of the C&D debris landfill will be required. <br /> ■ No additional geotechnical or hydrogeological investigations will be required for C&D debris <br /> landfill permitting. <br /> CDMA-3 B1994.doa <br />