My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/12/2017 (3)
CBCC
>
Meetings
>
2010's
>
2017
>
09/12/2017 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2017 4:00:46 PM
Creation date
10/26/2017 2:45:41 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
09/12/2017
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
451
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(automotive fluid sales and services) is an administrative permit use, and a fast food restaurant with drive <br />through is not an allowed use. Both uses are permitted (by -right) uses in the CG, General Commercial <br />zoning district. Therefore, the developer has two options to seek approval for the proposed project. The <br />first option is to make an application for a rezoning from CL to CG. If the property were rezoned to CG, <br />then the applicant would need to submit a site plan application for the project. The second option involves <br />seeking a rezoning to PD and submittal of a conceptual PD plan. <br />It is staff's position that the PD rezoning process is the best option for accomplishing the applicant's <br />objective. Therefore, staff encouraged the applicant to pursue the PD rezoning option. Because a rezoning <br />to CG would allow a number of uses that may not be desirable in the area of the subject site, a CG rezoning <br />could be problematic. In addition, there is no CG -zoned parcel in the immediate area, but there are other <br />PD -zoned properties. Unlike a CG rezoning, rezoning to PD allows the County to control the types of <br />permitted uses, and to prohibit or limit other less desirable uses. <br />The PD Zoning District Generally: <br />There have been several commercial PD rezoning districts approved by the County. Unlike standard zoning <br />districts, there are no specific size or dimension criteria for PD districts. Instead, the PD district is based on <br />the underlying land use plan designation for density/intensity and use limitations, and on compatibility <br />requirements. In the PD zoning district, specific allowable uses, setbacks, and other typical zoning district <br />regulations are established on a site -by -site basis through approval of a conceptual PD plan. Additional <br />aesthetic design standards may also be required under the PD rezoning process. Adopted as part of the PD <br />zoning for a property, the conceptual PD plan serves as the zoning standard for the site. <br />A rezoning to the PD district requires the submission of a binding conceptual PD plan which, along with <br />certain PD district requirements, limits uses and sets -forth specific development standards on the site. <br />Thus, a PD rezoning allows a unique PD district to be developed specifically for each development site. <br />In this case, the conceptual PD plan proposes a 110 room hotel, a tire store, a multi -tenant strip building, a <br />stand-alone restaurant, and a stand-alone fast food restaurant with drive through on 9.66 acres. Aspects of <br />the proposed conceptual PD plan will be addressed in the "PD Plan Analysis" section of the staff report. <br />The applicant is not proposing to change any of the CL size and dimensional criteria through the PD. <br />The PD Rezoning Process: <br />The PD rezoning review, approval, and development process is as follows: <br />STEP 1. Rezoning and Conceptual PD Plan Approval: Review and recommendation made by staff <br />and by the PZC. Final action taken by the BCC. <br />STEP 2. Preliminary PD Plan/Plat (combination of site plan and preliminary plat) Approval: Review <br />and recommendation made by staff. Final action taken by the PZC. Must comply with the <br />approved conceptual PD plan and any conditions imposed by the BCC at the time of PD <br />zoning approval (Step 1). <br />STEP 3. Land Development Permit (LDP) or LDP Waiver: Reviewed and issued by staff for <br />construction of subdivision improvements (road, utilities, drainage). <br />C:\Users\legistar\AppData\Local\Temp\BCL Technologies\easyPDF 8\@BCL a 5C095483\ n BCL n 5C095483.docx 2 <br />P271 <br />
The URL can be used to link to this page
Your browser does not support the video tag.