My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/12/2017
CBCC
>
Meetings
>
2010's
>
2017
>
12/12/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2025 1:17:03 PM
Creation date
1/10/2018 9:29:51 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
12/12/2017
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
nTf�as� <br />A. Pre -Construction Services: <br />The Engineer will review the Contractor's pre -construction submittal documents, which may vary <br />based on permitting requirements, for conformance with the contract requirements. <br />The Engineer will conduct a pre -construction meeting with the County, Contractor, Impacted <br />Utility Providers, and other appropriate project stakeholders. This service will include <br />coordination of the meeting time and location with attendees, preparation of a meeting agenda, <br />leading the meeting, and distribution of meeting minutes. <br />B. Construction Progress Meetings <br />The Engineer will conduct weekly construction progress meetings with the County, contractor, <br />and other appropriate project stakeholders. This service will include coordination of the meeting <br />time and attendees, preparation of a meeting agenda, leading the meeting, and distribution of <br />meeting minutes. Based on a construction duration of two months, eight progress meetings are <br />anticipated. It is expected the meetings will be held at the project site and will coincide with the <br />Engineer's weekly part time construction observation visits. In conjunction with the weekly <br />meeting, the Engineer will provide a brief summary for the previous week with applicable field <br />reports attached. <br />Typical items addressed during the progress meetings will include: <br />• Schedule updates and progress review <br />• Pay application status <br />• Shop drawings and submittal review status <br />• Action items / remedial actions <br />• Requests for clarification and information <br />• Safety <br />• Turbidity monitoring review <br />• Environmental observation review <br />• SWPPP review <br />C. Part Time Construction Observation <br />The Engineer will conduct periodic site visits to observe and document the progress of the <br />project, and assist the County in determining if the work is proceeding in general accordance with <br />the contract documents. It is anticipated that the Engineer will make one site visit per week, <br />spending approximately two hours on site during each visit. Site visits will include observations <br />of the demolition area from the bridge or adjacent shore. Site visits will not include; observations <br />from on the water or a vessel, diving or underwater observations, or observations at the reef <br />disposal site. These site visits are not intended to be exhaustive or to extend to every aspect of <br />the work, but rather are to be limited to spot checking and similar methods of general observation <br />of the work based on the Engineer's exercise of professional judgement. These site visits will be <br />scheduled to coincide with the weekly progress meetings. <br />The purpose of the site visits will be to: <br />• Monitor construction progress <br />• Observe contractor's work practices <br />• Spot check work for conformance with contract documents and advise the County and <br />contractor of any non-compliant work <br />• Document the progress, findings, and observations of each visit with field book notes, <br />observation reports, and photos. <br />Page 4 of 7 <br />P32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.