My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-029F
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-029F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2020 12:19:43 PM
Creation date
2/20/2018 1:35:08 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
02/13/2018
Control Number
2018-029F
Agenda Item Number
8.N.
Entity Name
Kimley Horn and Associates
Subject
Floridan Wellfield Assessment and Improvements
Alternate Name
Well Performance Field Testing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Consultant will help define spare parts inventory needed to improve wellfield <br />reliability. <br />CONSULTANT will develop a table which outlines the specific requirements and <br />information on each of the wells, wellpumps, and motors. <br />CONSULTANT will evaluate standby generator capability and potential limitations <br />of existing standby power capacity. <br />CONSULTANT will evaluate the applicability of variable frequency drives (VFD's) <br />at the wells which may warrant installation of VFD's. The evaluation will consider <br />return on investment (ROI) and the additional maintenance and replacement costs <br />which can be inherent with VFD installation at wells. <br />Consultant will review existing raw water quality data with respect to the design <br />water quality used for membrane selection. Consultant will provide <br />recommendation of impacts to treatment plant or if further and additional raw <br />water quality analysis is necessary. <br />TASK 3 - SCADA SYSTEM and FIBER SYSTEM EVALUATION - WELLS <br />It is recommended to continue with the PLC upgrade project described in the Final <br />Report - Water Plant SCADA Improvements Evaluation, May 2015, and work <br />completed in early 2016 (Refer to attached report schedule). The existing PLC and <br />control system is antiquated, has been discontinued, replacements are difficult and <br />costly to acquire, and Allen-Bradley has discontinued manufacturing and support <br />of the PLC5 hardware, which comprises the majority of the hardware at both water <br />plants. The completed system would provide all of the advantages noted <br />previously and also allow for any future changes to well sequencing. This will also <br />allow further well upgrades without installing additional CPU's at additional cost <br />at each of the wells. <br />Consultant will review fiber optic (FO) system, and identify final improvements to <br />complete the FO system to all wells at both water treatment plants. Consultant will <br />review previous construction documents and record drawings, provide field <br />investigations of each wellsite, and verify existing equipment at each well. <br />Consultant will review and identify individual well improvements to integrate FO <br />at each well and develop a summary of improvements that can be designed for <br />FAUtilities\UTILITY - Engineering\WATER\Wells\Admin\IRCU Floridan Well Improvements 1.29.18.docx Page 3 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.