Laserfiche WebLink
implementation. Consultant will investigate the conversion of Hobart well panels <br />to strictly remote I/O versus the existing PLC CPU and I/O at each well and <br />provide a summary of recommentions. <br />Consultant will review the SCADA system programming and develop an <br />automated wellfield matrix for each water plant. The current operation at Hobart <br />wellfield includes manipulation of discharge check valve to potentially be closed <br />during pump startup, therefore modification of this operation will be evaluated. <br />TASK 4 - PREPARE TECHNICAL REPORT AND DESIGN GUIDELINES <br />Consultant will prepare report on findings, recommendations, costs, summary of <br />individual well improvements, auxiliary power requirements. <br />Consultant will prepare design guidelines for the improvements at each well, <br />including sketches, costs, and list of improvements. Design of these improvements <br />(VFD's, FO, auxiliary power if needed) is not included in this scope, but can be <br />provided as additional services. <br />CONSULTANT will finalize summary report after review meeting and furnish up <br />to six (6) copies of report, including electronic in PDF format. <br />Consultant will attend a coordination meeting to discuss the report on the findings. <br />Summary of Items to Complete <br />OSLO WTP <br />• Review fiber optic (FO) system, identify final improvements to complete FO to all <br />wells <br />• Identify individual well improvements to integrate FO at each well (CM, CSD) <br />• Conduct well testing and update well performance data — specific capacity, water <br />quality, well pump data (JLA) <br />• Evaluate existing well pump/flows — pump curves, develop RWM model, specific <br />capacity with intent to install VFD's on several wells <br />• Prepare table of complete well data <br />• SCADA review & programming for wellfield matrix, etc. (CSD) <br />• Prepare report on findings, recommendations, costs, auxiliary power (JLA, CSD, <br />C&W) <br />• Update design water quality to plant <br />FAUtilitieAUTILITY - Engineering\WATER\WeIISWdmin\IRCU Floridan Well Improvements 129.18.docx Page 4 of 7 <br />