My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-029F
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-029F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2020 12:19:43 PM
Creation date
2/20/2018 1:35:08 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
02/13/2018
Control Number
2018-029F
Agenda Item Number
8.N.
Entity Name
Kimley Horn and Associates
Subject
Floridan Wellfield Assessment and Improvements
Alternate Name
Well Performance Field Testing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
implementation. Consultant will investigate the conversion of Hobart well panels <br />to strictly remote I/O versus the existing PLC CPU and I/O at each well and <br />provide a summary of recommentions. <br />Consultant will review the SCADA system programming and develop an <br />automated wellfield matrix for each water plant. The current operation at Hobart <br />wellfield includes manipulation of discharge check valve to potentially be closed <br />during pump startup, therefore modification of this operation will be evaluated. <br />TASK 4 - PREPARE TECHNICAL REPORT AND DESIGN GUIDELINES <br />Consultant will prepare report on findings, recommendations, costs, summary of <br />individual well improvements, auxiliary power requirements. <br />Consultant will prepare design guidelines for the improvements at each well, <br />including sketches, costs, and list of improvements. Design of these improvements <br />(VFD's, FO, auxiliary power if needed) is not included in this scope, but can be <br />provided as additional services. <br />CONSULTANT will finalize summary report after review meeting and furnish up <br />to six (6) copies of report, including electronic in PDF format. <br />Consultant will attend a coordination meeting to discuss the report on the findings. <br />Summary of Items to Complete <br />OSLO WTP <br />• Review fiber optic (FO) system, identify final improvements to complete FO to all <br />wells <br />• Identify individual well improvements to integrate FO at each well (CM, CSD) <br />• Conduct well testing and update well performance data — specific capacity, water <br />quality, well pump data (JLA) <br />• Evaluate existing well pump/flows — pump curves, develop RWM model, specific <br />capacity with intent to install VFD's on several wells <br />• Prepare table of complete well data <br />• SCADA review & programming for wellfield matrix, etc. (CSD) <br />• Prepare report on findings, recommendations, costs, auxiliary power (JLA, CSD, <br />C&W) <br />• Update design water quality to plant <br />FAUtilitieAUTILITY - Engineering\WATER\WeIISWdmin\IRCU Floridan Well Improvements 129.18.docx Page 4 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.