Laserfiche WebLink
OCT 20 1.997 <br />Base Bid - Court- <br />house and 6arage <br />Alt. II -IFAS Outer <br />Skin. <br />Alt. III -7th <br />Courtroom <br />Alt. IV -Natural <br />Limestone <br />Alt. V4ranite <br />Pavers <br />Alt. VI --Three Ply <br />Roof <br />Alt. vii- <br />ReciprvAiq Chill. <br />Alt. I1 -CM <br />carpeting <br />TOTAL <br />mot 87 wif .� <br />INDIAN RIVER COUNTY COURTHOIISE BIDS <br />BIL7M Ca6T. <br />BIMI Calif. <br />FM i MM MM DL TICKER, INC. <br />MMI CAST <br />IEIT1 CO. <br />13,1629"0." <br />129791910.0 <br />129745,NLN 1295779"0." 129127,N0." <br />129921910." 13, 5009100. N <br />3!0,ULU <br />275, "O.N <br />M9,"I.N 2949OLN 21591"." <br />333, 860." <br />305, N0. N i <br />1139 UL N <br />124,"0." <br />146, N0.10_ 14%6". N 134,"0." <br />1090"." <br />1279m. <br />959OL M <br />21,1"." <br />769 "0. N 22, 686." 37, N0. N <br />60, N0. N <br />19, 860. N <br />N, NL N <br />799OL M <br />7291". N 66, 4N.N 649OL M <br />619OL M <br />749 9M. N <br />-AWL" <br />-139000.10 <br />-409 N0. N -159UL N -6,00.0 <br />-179MLIM <br />-51,99L89 <br />-159"0.N <br />-159"0.89 <br />-Li9N1." K -119"0." <br />-10,860.0 <br />-8,860." <br />195,NLM <br />18795"." <br />18;NLW 1799100." Z MLW <br />179,M.N <br />1"99OLM <br />13,912,"0." 13,44895"." <br />139456,"1." 1392Ty6"." 1394619"1.10 139633 OLIS 14,227,100." <br />Estimated budget for the construction was $13,480,000. <br />Staff along with our Construction Manager, Centex Rooney and <br />Architect, PGA&L recommends award of bid to James A. Cummings, Inc. <br />at a total bid of $13,272,600 which includes base bid plus: <br />Alternate II EIFAS Exterior Finish <br />Alternate III Finishing 7th Courtroom <br />Alternate IV Using Natural Limestone <br />Alternate V Installing Granite Pavers <br />Alternate VI Three Ply Roof <br />Alternate VII Using Reciprocating Chillers <br />Alternate IX Installing C & A Carpet <br />Commissioner Bird commented that he hoped local suppliers be <br />used as much as possible, and Director Dean replied that in <br />addition to using local suppliers, some of the sub -contractors are <br />local. <br />24 <br />