Laserfiche WebLink
MAR m 2 �99,1 <br />BOOK 88 PAGE 976 <br />ALT�rrAT=vgs AND MMYSiS <br />The preliminary estimate for the projects, which was <br />prepared when the budget was proposed in the spring of 1991, <br />was not based upon a completed design. The three bids for <br />the project only varied, by $6,000. The project could be <br />scaled down in scope by eliminating some of the 37 parking <br />y spaces (approximately $45,000 of the $60,737.72 is <br />attributable to the parking lots), however, demand at the <br />park warrants the 37 spaces. The alternatives presented are <br />as follows: <br />Alternative No.l <br />Appropriate the $60;737.72 from general fund <br />contingencies and award the low bid to JoBear, Inc. of <br />Palm Bay, Florida. <br />Alternative No. 2 - <br />Reject all bids and construct basketball court <br />resurfacing with the County's annual asphalt <br />resurfacing contractor. The court resurfacing is <br />estimated to cost $16,000. Parking lots could be <br />constructed by Road and Bridge Division with a material <br />cost of 15,535. <br />Alternative No. 3 <br />Reject all bids and cancel both projects. The County <br />has expended approximately $4,000 in engineering fees, <br />permit costs, and site plan approval costs at this <br />time. All permits for the project have been acquired, <br />including a St. Johns River Water Management District <br />permit. <br />Alternative No. 2 is recommended whereby the County Road <br />and Bridge Petition Paving Division constructs the parking <br />lots and court resurfacing at an approximate cost of $31,535 <br />in materials. All bids would be rejected. Funding would be <br />from general fund contingency. <br />ON MOTION by Commissioner Eggert, SECONDED by <br />Commissioner Adams, the Board unanimously (4-0, <br />Commissioner Bird being absent) agreed to reject all <br />bids and authorize the County Road and Bridge <br />Petition Paving Division to construct the parking <br />lots and court resurfacing at an approximate cost of <br />$31,535.00 in materials, as recommended by staff. <br />48 <br />