impacts and to ensure compatibility of the use with the surrounding <br />area. <br />ANALYSIS: <br />1. Zoning Classification: A-2, Agricultural, up to 1 unit per 10 <br />acres <br />2. Land Use Designation: AG -2, Agricultural, up to 1 unit per 10 <br />acres <br />3. Surrounding Land Use and Zoning: <br />North: Vacant/A-2 <br />South: Vacant/A-2 <br />East: Park Lateral Canal, roadway/A-2 <br />West: CR 512/A-2 <br />Note: The nearest residences are located approximately 1,500' <br />(.3 of a mile) to the south and approximately 2,000' (.4 of a <br />mile) to the east of the site. <br />4. Total Area of Development: t50 acres <br />5. Building Area: 288 sq. ft. <br />. s <br />Note: As depicted on the conceptual plan, the <br />administrative/security functions are proposed to be housed in <br />a 288 sq. ft. trailer. If a trailer is to be used, the <br />applicant must receive administrative permit approval for <br />accessory trailer housing for a night watchman pursuant to the <br />specific land use criteria set forth in Section 971.41 of the <br />county's land development regulations. Such approval will <br />need to be included with any subsequent site plan request. If <br />trailer use is not approved, then a structure meeting the <br />building code will need to be used. <br />6. Impervious Surface: The applicant anticipates that the total <br />impervious surface on the site will not exceed 5,000 sq. ft. <br />Final calculations will be presented with any subsequent site <br />plan submittal. <br />7. Open Space: Required: 80% <br />Provided: 98% (excluded from the open space <br />area are the estimated impervious <br />surface area and 40,000 sq. ft. of <br />incinerator operation area.) <br />8. Traffic Circulation: The conceptual plan proposes access to <br />the site directly from CR 512, and proposes CR 512 as the <br />principal project haul route. An existing access to the site <br />off Park Lateral Canal roadway may remain useable as an <br />emergency access only, and is not to be used for project <br />operation. The County Traffic Engineer has reviewed and <br />approved the proposed access and circulation plan. <br />9. Stormwater Management: The Public Works Department has <br />approved the conceptual drainage plan for the proposed <br />project. The final drainage plan design, as required by <br />Stormwater Management and Flood Protection chapter 930 of the <br />LDRs, will be provided with a subsequent site plan <br />application. <br />10. Landscaping and Buffering: The site contains adequate acreage <br />to accommodate off-street parking and non -vehicular open space <br />landscaping requirements which would be applied to the project <br />during review and approval of any subsequent site plan <br />request. <br />28 <br />AY J 8 1993 �ooK .89 Fad :569 <br />J <br />